MSM+ HB
16.2.4
Measurement with PLM
Observe the sequence when setting up the connection with the LaserDiagnostics software LDS.
Only then the LDS integrates the results of the power measurement into the results of the MSM+ HB mea-
surement. This means that the actual power is stored to every single plane.
Otherwise, the LDS considers the two devices as two completely independent devices.
1.
Start the LDS
The start screen appears.
2.
Select the Measure operating mode.
The Connections window appears.
3.
First click on the power meter.
4.
Click on the button Connect to
device.
5.
Then click on the MSM+ HB.
6.
Click on the button Connect to
device again.
Start the cooling approx. 2 minutes before the start of the measurement and stop it approx. 1 minute after
the end of the measurement operation.
Only cool the device during measurement operation. The number of operating hours has an impact on the
service life of the turbine in the PowerLossMonitor PLM.
Revision 00 EN - 02/2022