Operation Panel I/O Unit - Mitsubishi Electric M800VS Series Connection And Set Up Manual

Hide thumbs Also See for M800VS Series:
Table of Contents

Advertisement

M800VS/M80V Series Connection and Setup Manual
5 Installation
5.3 Unit Installation

5.3.3 Operation Panel I/O Unit

Mount the operation panel I/O unit with the prescribed number of fixing screws.
Note
(1) Refer to "4.8 Operation Panel I/O Unit" for the installation dimensions and screw hole positions.
FCU8-DX731/FCU8-DX750/FCU8-DX760/FCU8-DX761/FCU8-DX834
Fixing screw: M3 (4 pieces)
[Installation on the back side of the keyboard]
Operation panel I/O unit can be installed on the back side of the keyboard.
Fixing screw: M3 x 25 (4 pieces)
IB-1501613-A
200

Advertisement

Table of Contents
loading

This manual is also suitable for:

M80v series

Table of Contents