Mitsubishi Electric M800VS Series Connection And Set Up Manual page 28

Hide thumbs Also See for M800VS Series:
Table of Contents

Advertisement

17.1.1 Setting the Rotary Switch ........................................................................................................................... 376
17.1.2 Setting the DIP Switch................................................................................................................................ 377
17.2 Setting Drive Unit MDS-EM/EMH Series ............................................................................................................ 378
17.2.1 Setting the Rotary Switch ........................................................................................................................... 378
17.3 Setting Drive Unit MDS-EJ/EJH Series............................................................................................................... 379
17.3.1 Setting the Rotary Switch ........................................................................................................................... 379
17.3.2 Setting the DIP Switch................................................................................................................................ 380
17.5 Connecting the Batteries..................................................................................................................................... 382
17.5.1 Control Unit Battery .................................................................................................................................... 382
17.5.2 Servo Drive Unit Battery ............................................................................................................................. 384
17.6 Connecting and Setting the Remote I/O Unit ...................................................................................................... 387
17.6.1 Outline of the Remote I/O Unit ................................................................................................................... 387
17.6.2 Connection and Station No. Setting on Remote I/O Unit ........................................................................... 389
17.6.3 Station No. Setting When Using Multiple Remote I/O Units ....................................................................... 392
17.6.4 PLC Device Assignment of Digital Signal (DI/DO) ..................................................................................... 396
17.6.4.1 Fixed Device Assignment .................................................................................................................. 397
17.6.4.2 Arbitrary Device Assignment ............................................................................................................. 398
17.6.5 Thermistor Input Interface .......................................................................................................................... 402
17.7 Initializing the NC Internal Data (SRAM)............................................................................................................. 403
18 Setting Up with M80/M800S SETUP INSTALLER ................................................................................ 405
18.1 Activate M80/M800S SETUP INSTALLER ......................................................................................................... 407
18.2 Install Custom Screen ......................................................................................................................................... 410
18.3 Install Start-up Screen......................................................................................................................................... 411
18.4 Install APLC C Language Module ....................................................................................................................... 412
18.5 Install User Cycle ................................................................................................................................................ 413
19 Setting the Parameters and Date/Time ................................................................................................ 415
19.1 Selecting the NC System Type and Displayed Language .................................................................................. 416
19.2 Setting the Parameters for the System Specifications ........................................................................................ 417
19.3 Setting the Parameters for the Machine Specifications ...................................................................................... 418
19.4 Setting Date and Time ........................................................................................................................................ 420
20 Sequence Program Writing ................................................................................................................... 421
20.1 Writing Sequence Program using the SD Card................................................................................................... 422
20.2 Setting the Ethernet Communication .................................................................................................................. 422
20.2.1 Confirming the IP Address for CNC ........................................................................................................... 422
20.2.2 Setting the IP Address for PC Side ............................................................................................................ 422
20.3 Connecting the Control Unit and a Personal Computer ...................................................................................... 424
20.4 Setting the Communication with GX Works2 ...................................................................................................... 425
20.5 Setting the Parameters on GX Works2 ............................................................................................................... 427
20.5.1 Parameter Setting Screen .......................................................................................................................... 427
20.5.2 Setting Device Points ................................................................................................................................. 428
20.5.3 Setting the Number of Common Pointer Points ......................................................................................... 429
20.5.4 Setting the Program Execution Order ........................................................................................................ 430
20.6 Writing a Sequence Program with GX Works2 ................................................................................................... 431
20.7 Writing a Sequence Program to ROM with GX Works2...................................................................................... 434
20.8 Setting the PLC Parameters ............................................................................................................................... 435
21 Confirming the Basic Operation ........................................................................................................... 437
21.1 Checking Inputs/Outputs and Alarms.................................................................................................................. 438
21.2 Confirming Manual Operation ............................................................................................................................. 439
21.2.1 Using the Manual Pulse Generator ............................................................................................................ 439
21.2.2 Using JOG Feed......................................................................................................................................... 439
21.3 Servo Simplified Adjustment ............................................................................................................................... 440
21.3.1 First Measure Against Vibration ................................................................................................................. 440
21.3.2 NC Analyzer2 ............................................................................................................................................. 441
22 Setting the Position Detection System ................................................................................................ 443
22.1 Adjusting the Absolute Position Detection System ............................................................................................. 444
22.1.1 Marked Point Alignment Method I .............................................................................................................. 445
22.1.2 Marked Point Alignment Method II ............................................................................................................. 447
22.1.3 Machine End Stopper Method: Automatic Initialization .............................................................................. 449
22.1.4 Machine End Stopper Method: Manual Initialization .................................................................................. 453

Advertisement

Table of Contents
loading

This manual is also suitable for:

M80v series

Table of Contents