16 Setup Outline

16.2 Flow of Initial Setup

16.2 Flow of Initial Setup
The following flow chart shows the procedures of the initial setup.
Note
(1) When setting up with backup files, refer to "35 Data Backup and Restoration".
WARNING
Do not cancel the emergency stop before confirming the basic operation.
Start
Confirming the connection between
control unit and peripheral devices
Points
Is the power supply within a specified range?
Is the power supply polarity correct?
Is the connection of the motor power cable and the encoder cable correct?
Is the grounding correct?
Connecting and Setting the Hardware
Carry out the connecting and setting of drive units, batteries and remote I/O units.
Initialize the NC Internal data (SRAM).
Setting Up with
M80/M800S SETUP INSTALLER
Install the custom data (G code guidance data),
start-up screen and user cycle.
If you do not need the installation, go to the next section.
Setting the machine parameters (1)
Selecting the NC system type and displayed language.
Setting the parameters for the system specifications.
Formatting the NC memory
Setting the machine parameters (2)
Setting the parameters for the machine specifications.
Setting Date and Time
Set the date and time on the integrated time screen.
Sequence Program Writing
Write the created sequence program to NC's ROM using GX Developer or GX Works2.
Confirming the Basic Operation
Confirm input/output of signals, alarm display and manual operation.
Setting the Position Detection System
Carry out the setting for establishing the reference position (zero point).
Setting the Stored Stroke Limit
Set the tool entry prohibited range.
Setting the Machine Error Compensation
Set the memory-type pitch error compensation, the memory-type relative position error
compensation, and the bidirectional pitch error compensation.
Setting the Position Switches
Set the position switches.
Setting the Backash Compensation
Set the backlash compensation and the backlash compensation II.
Confirming the Spindle Operation
Confirm that the spindle operates properly in manual/MDI operation.
Confirm the spindle rotation speed as well.
Setting the Handy Terminal
Input the customized data for the handy terminal.
(Note) This procedure is required only when connecting the handy terminal.
Inputting the machining program
End
IB-1501613-A
Refer to section 17
Refer to section 18
Refer to section 19.1 to 19.2
Refer to section 19.2
Refer to section 19.3
Refer to section 19.4
Refer to section 20
Refer to section 21
Refer to section 22
Refer to section 23
Refer to section 24
Refer to section 25
Refer to section 26
Refer to section 27
Refer to section 28
Refer to the Instruction Manual
372

Advertisement

Table of Contents
loading

This manual is also suitable for:

M80v series

Table of Contents