Installation

5
Installation
5.1

General installation procedure

Preliminary requirements
Procedure
1. Prepare for installation. Do these steps:
a. Prepare the site. Refer to section 5.2.1.
b. Unpack the EVSE. Refer to section 4.2.1.
c. Move the cabinet to the correct location. Refer to section 4.3.
2. If a lower installation of the EVSE is required, for wheelchair accessibility,
remove the base. Refer to section 10.10.4.
3. Do the mechanical installation. Refer to section 5.5.1.
4. Do the electrical installation. Refer to section 5.6.1.
5. If it is necessary, install these optional elements:
6. Prepare for commissioning. Refer to section 5.9.
5.2

Site preparation

5.2.1

Prepare the site

Preliminary requirements
42
All required permits to
obey the local rules are
granted.
The AC input cable is
available.
Installation engineer
Tilt sensors. Refer to section 5.7.
Cable management system. Refer to section 5.8.
Installation engineer
Tools for installation. Refer
to section 10.5.
There is no voltage on
the AC input cable during
the complete installation
procedure.
9AKK108466A3703-EN | 001