PERIODIC MANTEINANCE
In order to ensure continued safe performance of the equipment, a periodic
maintenance program must be established. It is the owner's responsibility to
supply or arrange for this service.
There are two levels of maintenance, the first consists of tasks which are
performed by the user/operator, and the second are those tasks to be
performed by qualified X-ray service personnel.
Service tasks here described must be performed exclusively by service
personnel specifically trained on medical X-ray Units. The first periodic
maintenance service should be performed six (6) months after installation, and
the subsequent services at twelve (12) month intervals.
Heavy duty installations (more than125 patients per day) require a regular six
(6) month maintenance.
The manufacturer undertakes to have available spare parts for this equipment
at least for ten (10) years after the unit manufacturing.
NEVER ATTEMPT TO PERFORM MAINTENANCE TASKS
WHILE THE ME EQUIPMENT IS IN USE WITH A PATIENT.
The tasks of this periodic maintenance shall include the following items:
DO NOT REMOVE ANY COVER, DISASSEMBLE OR
MANIPULATE INTERNAL COMPONENTS IN THE UNIT.
THESE ACTIONS COULD CAUSE SERIOUS PERSONAL
INJURIES AND / OR EQUIPMENT DAMAGE.
NEVER ATTEMPT TO CLEAN ANY PART OF THE UNIT WHEN
IT IS SWITCHED ON. ALWAYS SWITCH OFF THE EQUIPMENT
AND ISOLATE THE MAINS ELECTRICAL SUPPLY BEFORE
CLEANING.
1.
Switch the System OFF.
2.
Externally, check the proper cable connections between each major
component in the X-ray system (Table, Wall Stand, Tube Stand,
Generator Cabinet, etc ... ).