B&R Automation PC 3100 User Manual page 118

Hide thumbs Also See for Automation PC 3100:
Table of Contents

Advertisement

Technical data
4.7.6.5.5 5AC901.BUPS-01 - Dimensions
4.7.6.5.6 5AC901.BUPS-01 - Drilling template
4.7.6.5.7 Installation
For information about installation and connecting to the UPS IF option, see section
UPS battery unit" on page
4.7.6.5.8 Precautions for handling and use
Spills and leaks:
Further leakage must be prevented. Smaller spills must be bonded with dry sand, dirt and vermiculite. The use of
flammable materials is not permitted. If possible, neutralize acids with sodium bicarbonate, chalk, etc. Acid-resistant
clothing, shoes, gloves as well as acid-resistant face protection must be worn. The disposal of unneutralized acid
in the sewage system is prohibited!
Waste disposal:
Used batteries and rechargeable batteries must be disposed of in an environmentally friendly recycling process.
Neutralized mud must be stored in closed containers and stored / disposed of in accordance with applicable reg-
ulations. After neutralization and inspection, larger spills diluted with water must be disposed of in accordance with
applicable regulations.
118
181.5
140
20
7.5
0
222.
76
21.6
5.5
ø11
100
115
5.5
ø 11
115
107.5
Automation PC 3100 User's manual V 2.10
"Installing and connecting the

Advertisement

Table of Contents
loading

This manual is also suitable for:

Apc 3100

Table of Contents