A.3
Module Installation Procedure
Step
Task
1
Re-install the module:
First, take care to ensure the Teflon guide ramp is
properly engaged with the module.
Then, use the front thumb tabs on the module to slide
the module into a position that allows re-installation of
the Reference and Ribbon Cables.
Appendix A
MBT-5000A L-Band Up/Down Converter System
A–6
Revision 1
MN-MBT-5000A