Install The Unit Into A Rack Enclosure - Comtech EF Data MBT-5000A Installation And Operation Manual

L-band up/down converter system
Table of Contents

Advertisement

CAUTION – THIS EQUIPMENT CONTAINS PARTS AND ASSEMBLIES SENSITIVE
TO DAMAGE BY ELECTROSTATIC DISCHARGE (ESD). USE ESD
PRECAUTIONARY PROCEDURES WHEN HANDLING THE EQUIPMENT.
Once opened, inspect the shipment:
Step
Task
1
Keep all shipping materials.
2
Check the packing list to make sure the shipment is complete.
Inspect the equipment for damage. If damage exists, immediately contact the carrier and CEFD to submit
3
a damage report.
4
Read the manual.
2.2

Install the Unit Into a Rack Enclosure

Install the MBT-5000A in its assigned position in the rack enclosure (Figure 2-2). Use, as
required:
A standard rack-mounted shelf;
User-supplied screws to secure the front panel to the rack enclosure threaded front
mounting rails;
CEFD's optional KT/6228-2 (4") or KT/6228-3 (10") Rear-Mounting Support Brackets Kit
(Figure 2-3);
CEFD's optional FP/SL0006 (26"), FP/SL0007 (24"), or FP/SL0008 (22") Bearingless
Rack Slide Set (Figure 2-4).
For information about custom rack enclosures and these optional installation accessories, contact
CEFD Product Support.
Installation
MBT-5000A L-Band Up/Down Converter System
2–2
Revision 1
MN-MBT-5000A

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MBT-5000A and is the answer not in the manual?

Questions and answers

Table of Contents