Select: Test Menu Branch - Comtech EF Data MBT-5000A Installation And Operation Manual

L-band up/down converter system
Table of Contents

Advertisement

5.2.6

SELECT: Test Menu Branch

TEST: Lamptest
Press ENTER to begin the diagnostics run on the front panel LED arrays and VFD. The Side A and
Side B LEDs will cycle, and the VFD will briefly generate a test pattern.
Once the test has run, press CLEAR to return to the SELECT: (Main) menu.
Front Panel Operation
MBT-5000A L-Band Up/Down Converter System
5–26
Revision 1
MN-MBT-5000A

Advertisement

Table of Contents
loading

Table of Contents