Figure 2-2. Unit Rack Enclosure Installation - Comtech EF Data MBT-5000A Installation And Operation Manual

L-band up/down converter system
Table of Contents

Advertisement

CAUTION – OBSERVE THE FOLLOWING:
CORRECT GROUNDING PROTECTION IS REQUIRED TO PREVENT
PERSONAL INJURY AND EQUIPMENT DAMAGE.
You must make sure the ground stud on the rear panel of the unit is always
connected to the protective earth.
SUFFICIENT AIR VENTILATION IS REQUIRED – Make sure there is adequate
air ventilation clearance inside the enclosure, especially at the side. In a rack
system where there is high heat discharge, provide forced-air cooling with
top- or bottom-mounted fans or blowers.
MAXIMUM AIR TEMPERATURE – Make sure the air temperature inside the
enclosure
Item
1
2
3
4
5
6
Installation
never
exceeds 60°C (140°F).
Custom Rack Enclosure
MBT-5000A Up/Down Converter System
Standard Rack Shelving
Rack Enclosure Threaded Front Rail (typical)
Unit Front Panel
User-supplied Screws

Figure 2-2. Unit Rack Enclosure Installation

MBT-5000A L-Band Up/Down Converter System
Description
2–3
Revision 1
MN-MBT-5000A

Advertisement

Table of Contents
loading

Table of Contents