Replacing The Primary Pump Head's Plunger And Seals - Waters ACQUITY UPLC Overview And Maintenance Manual

Quaternary solvent manager
Table of Contents

Advertisement

Figure 3–43: Inserting i
2
i
Valve connector
Connector receptacle
Knurled surface
9.
Power-on the solvent manager.
10. Prime the solvent manager (see

3.18 Replacing the primary pump head's plunger and seals

Refer to the console online Help to help determine whether the primary pump head's seals
require replacing.
Warning:
working with hazardous materials. Consult the Material Safety Data Sheets regarding
the solvents you use. Additionally, consult the safety representative for your
organization regarding its protocols for handling such materials.
Notice:
powder-free gloves when performing this procedure.
Required tools and materials
• Chemical-resistant, powder-free gloves
• 1/4-inch open-end wrench
• 5/16-inch open-end wrench
• T27 TORX driver
• Pliers
2
Valve connector into receptacle
1
Priming the solvent
Observe Good Laboratory Practice (GLP) at all times, particularly when
To avoid contaminating system components, wear clean, chemical-resistant,
August 8, 2016, 715005050 Rev. C
2
3
manager).
Page 79

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents