Status Led/Collect Button Removal; Timing Belt Removal (Rt Rear Transport Unit); Figure 4-39 Status Led/Collect Button Removal - JCM GLOBAL UBA Pro RT Series Operation And Maintenance Manual

Banknote recycler
Table of Contents

Advertisement

Disassembly/Reassembly

Status LED/Collect Button Removal

To remove the Status LED/Collect Button, proceed
as follows:
1. Remove the two (2) Screws (Figure 4-39
a
).
2
2. Remove the Status LED/Collect Button (Figure
4-39 b).
3. Remove the single (1) Spring (Figure 4-39 c)
from the Button.
Figure 4-39 Status LED/Collect Button
a
2
a
1
b
c

Figure 4-39 Status LED/Collect Button Removal

Timing Belt Removal (RT Rear 
Transport Unit)
To remove the Timing Belts (38-S1.5M-255UVE
and 40-S3M-324CL) out of the RT Rear Transport
Unit, proceed as follows:
1. Remove the six (6) Screws (Figure 4-40
through
a
).
6
2. Remove the Gear Pulley Cover (Figure 4-40 b).
Figure 4-40 Timing Belt Removal (RT Rear
b
Figure 4-40 Timing Belt Removal (RT Rear
Transport Unit) 1
P/N 960-000213R_Rev.A
UBA Pro RT/RQ™ Series Banknote Recycler
a
&
1
a
1
a
1
a
5
a
6
a
2
a
a
3
4
3. Remove the two (2) Pulley Shaft Assy. (Figure 4-
41
a
&
a
).
1
2
Figure 4-41 Timing Belt Removal (RT Rear
Figure 4-41 Timing Belt Removal (RT Rear
Transport Unit) 2
4. Remove the two (2) E-rings (Figure 4-42
a
).
2
Figure 4-42 Timing Belt Removal (RT Rear
a
1
a
2
Figure 4-42 Timing Belt Removal (RT Rear
Transport Unit) 3
5. Remove the two (2) Pulley Pins (Figure 4-43
&
a
) and the two (2) Pulleys (Figure 4-43
2
b
).
2
Figure 4-43 Timing Belt Removal (RT Rear
b
1
a
1
Figure 4-43 Timing Belt Removal (RT Rear
Transport Unit) 4
6. Remove the six (6) Driven Pulley Pins (Figure 4-
44
a
through
a
1
6
© 2020, JAPAN CASH MACHINE CO., LTD.
4 - 9
a
1
a
2
a
b
2
a
2
).
Section 4
&
1
a
1
b
&
1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Uba pro rq series

Table of Contents