Rt/Rq Collecting In Cash Box Flow Process 2 - JCM GLOBAL UBA Pro RT Series Operation And Maintenance Manual

Banknote recycler
Table of Contents

Advertisement

Installation

RT/RQ Collecting in Cash Box Flow Process 2

Figure 2-41 RT/RQ Collecting in Cash Box Flow
Process 2
C3
a
b
NO
YES
e
f
YES
NO
h
YES
NO
i
NO
YES
A
*1). When an abnormal signal is received, remove and re-supply Power to the RT/RQ Unit after resolving the problem, or send
a RESET Command from the Host Machine.
*2). When a "Cash Box Full" Signal is received, remove the Banknotes from the Cash Box and re-seat the Cash Box back into
the Unit. The RT/RQ will automatically start initializing.
P/N 960-000213R_Rev.A
UBA Pro RT/RQ™ Series Banknote Recycler
C3) From "Collecting in Cash Box 2" flowchart (Figure 2-40)
a) Transporting the Banknote to the Cash Box
NO
b) Was the Banknote transported to the Cash Box?
c
c) Retried the transportation operation three (3) times?
YES
d
d) Stop operation (Abnormal Signal Output (*1)
e) Collecting the Banknote
f) Is the Cash Box full?
g
g) Stop operation. Sending a FULL Signal (*2)
h) Was the Banknote collected due to the Abnormal 
B2
Banknote condition while dispensing?
B2) To "B2" Normal Dispensing (Figure 2-38)
i) Was the desired number of Banknotes collected 
B3
during "Collecting in Cash Box" sequence?
B3) To "B3" Collecting in Cash Box 1 (Figure 2-40)
A) Return to "A" Main flowchart (Figure 2-34)
Figure 2-41 RT/RQ Collecting in Cash Box Flow Process 2
© 2020, JAPAN CASH MACHINE CO., LTD.
2 - 2 7
Section 2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Uba pro rq series

Table of Contents