Timing Belt Removal (Transport Unit) - JCM GLOBAL UBA Pro RT Series Operation And Maintenance Manual

Banknote recycler
Table of Contents

Advertisement

Disassembly/Reassembly
10. Remove the three (3) E-rings (Figure 4-82
through
a
) and the three (3) Shafts (Figure 4-82
3
b
through
b
).
1
3
11. Remove the six (6) Sponge Roller Assy. (Figure
4-82
c
through
1
Figure 4-82 Sponge Roller Assy. Removal
b
c
Figure 4-82 Sponge Roller Assy. Removal
(Front Transport Unit) 5
NOTE: For the reassembly, install each
Shaft considering its "D-shape".
12. Remove the four (4) Pulley Pins (Figure 4-83
through
a
).
4
13. Remove the four (4) E-rings (Figure 4-83
through
b
) to remove the four (4) Sponge Roller
4
Assy. (Figure 4-83
Figure 4-83 Sponge Roller Assy. Removal
a
1
c
1
b
1
a
2
c
2
b
2
Figure 4-83 Sponge Roller Assy. Removal
(Front Transport Unit) 6
P/N 960-000213R_Rev.A
UBA Pro RT/RQ™ Series Banknote Recycler
c
).
6
b
a
2
1
a
2
1
a
3
b
3
c
4
c
5
1
c
c
6
2
c
3
b
c
through
c
).
1
4
a
c
3
3
b
3
b
4

Timing Belt Removal (Transport Unit)

a
1
To remove the Timing Belts (38-S1.5M-335UVE)
out of the Transport Unit, proceed as follows:
1. Remove the two (2) Screws (Figure 4-84
a
), the two (2) DURACON Washers (Figure 4-
2
84
b
&
b
1
c
&
c
).
1
2
2. Remove the two (2) E-rings (Figure 4-84
d
) and the two (2) DURACON Washers (Figure
2
4-84
b
&
3
4-84 e)
b
d
Figure 4-84 Timing Belt Removal (Transport
3
a
1
c
1
Figure 4-84 Timing Belt Removal (Transport Unit) 1
3. Remove the two (2) Screws (Figure 4-85
a
).
2
4. Remove the two (2) Spacers (Figure 4-85
b
) and two (2) DURACON Washers (Figure 4-
2
85
c
&
c
1
5. Remove the two (2) E-rings (Figure 4-85
d
), the two (2) Bearings (Figure 4-85
2
a
1
and the two (2) Polysliders (Figure 4-85
a
Figure 4-85 Timing Belt Removal (Transport
1
1
a
4
Figure 4-85 Timing Belt Removal (Transport Unit) 2
c
6. Remove the Drive Shat Assy. (Figure 4-86 a) and
4
the Pulley Beam B Assy. (Figure 4-86 b).
Figure 4-86 Timing Belt Removal (Transport
Figure 4-86 Timing Belt Removal (Transport Unit) 3
4 - 1 7
) and the two (2) Springs (Figure 4-84
2
b
) to remove the Shaft Assy. (Figure
4
1
e
d
2
b
4
b
1
b
2
a
c
2
2
).
2
d
1
e
1
f
1
b
1
c
1
f
2
e
c
2
b
2
b
© 2020, JAPAN CASH MACHINE CO., LTD.
Section 4
a
&
1
d
&
1
a
&
1
b
&
1
d
&
1
e
&
e
)
1
2
f
&
f
).
1
2
2
d
2
a
2
a

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Uba pro rq series

Table of Contents