Flapper Motor Test (Rq Transport); Note Position Sensor 4 - 6 Test (Rq Transport) - JCM GLOBAL UBA Pro RT Series Operation And Maintenance Manual

Banknote recycler
Table of Contents

Advertisement

Calibration and Testing

Flapper Motor Test (RQ Transport)

To run the Flapper Motor Test on the RQ Transport
side, proceed as follows:
1. Remove electrical power.
2. Set the DIP Switches of the UBA Pro Unit as
below (Figure 6-141).
Figure 6-141 Flapper
DIP Switches #1, #2, #6, #8 ON
ON
1
2
3
Figure 6-141 Flapper Motor Test (RQ Transport) 1
3. Set the DIP Switches of the RQ Unit as below
(Figure 6-142).
Figure 6-142 Flapper
DIP Switches #3, #8 ON
ON
1
2
3
Figure 6-142 Flapper Motor Test (RQ Transport) 2
4. Apply electrical power.
5. Confirm that the Status LED/Collect Button is lit
at
Green
Color and then turns off.
NOTE: Wait for the Status LED to turn off
in order to run the test properly.
Figure 6-143 Flapper Motor
Figure 6-143 Flapper Motor Test (RQ Transport) 3
6. Remove the Recycler from the RQ Transport.
7. Pull down the Front Transport Unit.
Figure 6-144 Flapper Motor
Figure 6-144 Flapper Motor Test (RQ Transport) 4
8. To start the Test, set the UBA Pro DIP Switch #8
to
(Figure 6-145).
OFF
P/N 960-000213R_Rev.A
UBA Pro RT/RQ™ Series Banknote Recycler
4
5
6
7
8
4
5
6
7
8
Green
ON
OFF
Figure 6-145 Flapper
DIP Switch #8 OFF
ON
1
2
3
Figure 6-145 Flapper Motor Test (RQ Transport) 5
9. The Rotary Guide (Figure 6-146 a) will change
the transport path in 3 directions when it func-
tions properly:
A: UBA Pro to Recycler
B: UBA Pro to Cash Box
C: Recycler to Cash Box.
Figure 6-146 Flapper Motor
A
a
Figure 6-146 Flapper Motor Test (RQ Transport) 6
10. Set the UBA Pro DIP Switch #8 to
test.
Note Position Sensor 4 - 6 Test 
(RQ Transport)
To run the Note Position Sensor 4 - 6 Test on the
RQ Transport side, proceed as follows:
1. Remove electrical power.
2. Set the DIP Switches of the UBA Pro Unit as
below (Figure 6-147).
Figure 6-147 Note
DIP Switches #1, #2, #6, #8 ON
ON
1
2
3
Figure 6-147 Note Position Sensor 4 - 6 Test
(RQ Transport) 1
3. Set the DIP Switches of the RQ Unit as below
(Figure 6-148).
Figure 6-148 Note
DIP Switches #4, #8 ON
ON
1
2
3
Figure 6-148 Note Position Sensor 4 - 6 Test
(RQ Transport) 2
© 2020, JAPAN CASH MACHINE CO., LTD.
6 - 2 7
4
5
6
7
8
B
a
C
a
to end the
ON
4
5
6
7
8
4
5
6
7
8
Section 6

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Uba pro rq series

Table of Contents