Flap Motor Harness Assy. Removal; Tr Worm Gear (Twin) Removal - JCM GLOBAL UBA Pro RT Series Operation And Maintenance Manual

Banknote recycler
Table of Contents

Advertisement

Disassembly/Reassembly
3. Separate the Rear Transport Unit (Figure 4-27 a)
as illustrated.
Figure 4-27 Rear Transport Unit Removal (RT
Figure 4-27 Rear Transport Unit Removal
(RT Frame Unit) 2

Flap Motor Harness Assy. Removal

To remove the Flap Motor Harness Assy. out of the
RT Frame Unit, proceed as follows:
1. Remove the five (5) Screws (Figure 4-28
through
a
) to remove the Gear Cover (Figure 4-
5
28 b).
Figure 4-28 Flap Motor Harness Assy.
b
a
1
a
2
a
3
a
4
a
5
Figure 4-28 Flap Motor Harness Assy. Removal
(RT Frame Unit) 1
2. Remove the Worm Wheel (Figure 4-29 a) and the
Worm Gear (Figure 4-29 b).
Figure 4-29 Flap Motor Harness Assy.
b
a
Figure 4-29 Flap Motor Harness Assy. Removal
(RT Frame Unit) 2
P/N 960-000213R_Rev.A
UBA Pro RT/RQ™ Series Banknote Recycler
Figure 4-30 Flap Motor Harness Assy.
a
Figure 4-30 Flap Motor Harness Assy. Removal

TR Worm Gear (Twin) Removal

To remove the TR Worm Gear (Twin) out of the RT
Frame Unit, proceed as follows:
a
1
Figure 4-31 TR Worm Gear (Twin) Removal
Figure 4-32 TR Worm Gear (Twin) Removal
4 - 7
3. Remove the Flap Motor Harness Assy. (Figure 4-
30 a).
a
(RT Frame Unit) 3
1. Remove the single (1) E-ring (Figure 4-31 a), the
single (1) Gear (Figure 4-31 b), the single (1)
Parallel Pin (Figure 4-31 c) and the single (1)
Rolled bushing (Figure 4-31 d).
Figure 4-31 TR Worm Gear (Twin) Removal
(RT Frame Unit) 1
2. Remove the single (1) E-ring (Figure 4-32 a) and
the single (1) Bearing (Figure 4-32 b).
a
b
Figure 4-32 TR Worm Gear (Twin) Removal
(RT Frame Unit) 2
© 2020, JAPAN CASH MACHINE CO., LTD.
Section 4
d
c
b
a

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Uba pro rq series

Table of Contents