Note Position Sensor 1 - 3 Test - JCM GLOBAL UBA Pro RT Series Operation And Maintenance Manual

Banknote recycler
Table of Contents

Advertisement

Section 6
4. Apply electrical power.
5. Confirm that the Status LED/Collect Button is lit
at
Green
Color and then turns off.
NOTE: Wait for the Status LED to turn off
in order to run the test properly.
Figure 6-104 Flapper Motor
Figure 6-104 Flapper Motor Test (RT Transport) 3
6. Remove the Recycler from the RT Transport.
7. Lift the Front Transport Unit.
Figure 6-105 Flapper Motor
Figure 6-105 Flapper Motor Test (RT Transport) 4
8. To start the Test, set the UBA Pro DIP Switch #8
to
(Figure 6-106).
OFF
Figure 6-106 Flapper
DIP Switch #8 OFF
ON
1
2
3
Figure 6-106 Flapper Motor Test (RT Transport) 5
9. The Rotary Guide (Figure 6-101 a) will change
the transport path in 3 directions when it func-
tions properly:
A: UBA Pro to Recycler
B: UBA Pro to Cash Box
C: Recycler to Cash Box.
Figure 6-107 Flapper Motor
A
a
Figure 6-107 Flapper Motor Test (RT Transport) 6
10. Set the UBA Pro DIP Switch #8 to
test.
P/N 960-000213R_Rev.A
UBA Pro RT/RQ™ Series Banknote Recycler
Green
ON
OFF
4
5
6
7
8
B
a
C
a
to end the
ON

Note Position Sensor 1 - 3 Test

To run the Note Position Sensor 1 - 3 Test on the
RT Transport side, provceed as follows:
1. Remove electrical power.
2. Set the DIP Switches of the UBA Pro Unit as
below (Figure 6-108).
Figure 6-108 Note
DIP Switches #1, #2, #6, #8 ON
ON
1
2
3
Figure 6-108 Note Position Sensor 1 - 3 Test 1
3. Set the DIP Switches of the RT/RQ Unit as below
(Figure 6-109).
Figure 6-109 Note
DIP Switch #4 ON
ON
1
2
3
Figure 6-109 Note Position Sensor 1 - 3 Test 2
4. Apply electrical power.
5. Confirm that the Status LED/Collect Button is lit
at
Green
Color and then turns off.
NOTE: Wait for the Status LED to turn off
in order to run the test properly.
Figure 6-110 Note Position
Figure 6-110 Note Position Sensor 1 - 3 Test 3
6. To start the Test, set the UBA Pro DIP Switch #8
to
(Figure 6-111).
OFF
Figure 6-111 Note
DIP Switch #8 OFF
ON
1
2
3
Figure 6-111 Note Position Sensor 1 - 3 Test 4
© 2020, JAPAN CASH MACHINE CO., LTD.
6 - 2 2
Calibration and Testing
4
5
6
7
8
4
5
6
7
8
Green
ON
OFF
4
5
6
7
8

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Uba pro rq series

Table of Contents