2 INSTALLATION

This section provides installation and operating
instructions for the UBA Pro RT/RQ™ Series
Banknote Recycler (RT/RQ). The information
within contains the following features:

Installation Procedure

DIP Switch Configurations
LED Flashing Patterns
Connector Pin Assignments
Preventive Maintenance
Standard Interface Circuit Schematics
Operational Flowcharts
Installation Procedure
Holes are provided in each Frame Unit to accom-
modate mounting the RT/RQ Unit during installa-
tion. Select and perform the following steps
required to install the RT/RQ Unit.
NOTE: Do Not exert external pressure
on the UBA Pro Unit. Strong pressure
on the Unit may cause the Unit's
performance to degrade.
NOTE: Ensure that there is sufficient
space to open, clean and maintain a UBA
Pro Unit (Refer to "Unit Dimensions" on
page 1-9).
Caution: Be sure to use specified Screw
Holes when installing the Unit.
Caution: To keep the Unit' performance
optimal, ensure that the mounting
location is horizontally at 0 degrees on a
flat surface and strong enough to
ensure the Unit weight.

Grounding

Caution: Be sure to connect the Frame
Housing to the Frame Ground of the
Host Machine.
NOTE: Prepare the following Grounding
Wire, Screw and Washer for grounding:
Grounding Cable with Conductor Diameter
1.6mm or lager
M4 W Washer (Large) Pan Head, Iron/
Chromium (III), 12mm or shorter
Toothed Washer
Tightening Torque: 120N·cm
P/N 960-000213R_Rev.A
UBA Pro RT/RQ™ Series
Banknote Recycler
S e c t i o n 2
1. Install the Toothed Washer (Figure 2-1 a), the
Grounding Wire (Figure 2-1 b) and then the
Screw (Figure 2-1 c) into the Frame Ground (Fig-
ure 2-1 d) in order.
NOTE: Refer to "Unit Dimensions" on
page 1-9) for each Frame Ground
location.
2. Tighten the Screw to secure the Wire and Washer.
Figure 2-1 Grounding
d
Figure 2-1 Grounding
Side Installation (For Standard and
Stacking Up (SU) Installation types)
When a side mounting configuration is preferred,
form the following procedure:
NOTE: Prepare the following Screw:
M4 Screw (the length of each M4 Screw
should not extend more than 6mm long
from the inside of the Frame)
Tightening Torque: 120N·cm
1. Secure the left and right side of the RT/RQ Frame
into its intended location using 8 (eight) M4
Screws from each side of the Frame (Figure 2-2
a
through
a
).
1
8
© 2020, JAPAN CASH MACHINE CO., LTD.
2 - 1
Edge Side
a
Round Side
b
c
per-

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Uba pro rq series

Table of Contents