Tape Board Removal; Drum Unit Disassembly - JCM GLOBAL UBA Pro RT Series Operation And Maintenance Manual

Banknote recycler
Table of Contents

Advertisement

Disassembly/Reassembly

Tape Board Removal

To remove the Tape Board out of the Recycler, pro-
ceed as follows:
1. Remove the two (2) Screws (Figure 4-93
a
).
2
2. Pull the Rear Cover (Figure 4-93 b) as illustrated
by the Arrow
tion indicated by the Arrow
Figure 4-93 Tape
a
1
b
Figure 4-93 Tape Board Removal 1
3. Cut the single (1) Cable Tie (Figure 4-94 a).
Figure 4-94 Tape
Figure 4-94 Tape Board Removal 2
4. Remove the four (4) Screws (Figure 4-95
through
a
) to remove the two Sensor Holder
4
Assy. (Figure 4-95
Figure 4-95 Tape
Figure 4-95 Tape Board Removal 3
P/N 960-000213R_Rev.A
UBA Pro RT/RQ™ Series Banknote Recycler
a
1
, and then remove in the direc-
.
a
a
a
1
b
&
b
).
1
2
b
2
a
4
a
3
a
2
a
b
1
1
5. Remove the two (2) Screws (Figure 4-96
to remove the two Tape Boards (Figure 4-96
b
).
2
&
Figure 4-96 Tape
Figure 4-96 Tape Board Removal 4

Drum Unit Disassembly

To separate the Drum Unit into the Drum 1 and
2
Drum 2 Units, proceed as follows:
1. Remove the six (6) Screws (Figure 4-97
through
a
6
2. Remove the Top Cover (Figure 4-97 b).
Figure 4-97 Drum
a
3
a
2
a
1
Figure 4-97 Drum Unit Disassembly 1
3. Separate the Drum Unit as illustrated.
Figure 4-98 Drum
Drum 2 Side
Figure 4-98 Drum Unit Disassembly 2
© 2020, JAPAN CASH MACHINE CO., LTD.
4 - 1 9
b
1
a
a
1
).
a
Drum 1 Side
Section 4
a
&
a
)
1
2
b
&
1
b
2
2
a
1
b
a
6
a
5
4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Uba pro rq series

Table of Contents