Drum 2 Motor Test (Rq Transport) - JCM GLOBAL UBA Pro RT Series Operation And Maintenance Manual

Banknote recycler
Table of Contents

Advertisement

Section 6
4. Apply electrical power.
5. Confirm that the Status LED/Collect Button is lit
at
Green
Color and then turns off.
NOTE: Wait for the Status LED to turn off
in order to run the test properly.
Figure 6-163 Drum 1 Motor
Figure 6-163 Drum 1 Motor Test (RQ Transport) 3
6. To start the Test, set the UBA Pro DIP Switch #8
to
(Figure 6-164)
OFF
Figure 6-164 Drum 1
DIP Switch #8 OFF
ON
1
2
3
Figure 6-164 Drum 1 Motor Test (RQ Transport) 4
7. The Drum 1 of the Recycler will start winding
the Tape until it reaches to "End" and then to
"Full" position back and forward repeatedly.
8. Set the UBA Pro DIP Switch #8 to
test.

Drum 2 Motor Test (RQ Transport)

To run the Recycler Solenoid on the RQ Transport
side, proceed as follows:
1. Remove electrical power.
2. Set the DIP Switches of the UBA Pro Unit as
below (Figure 6-165).
Figure 6-165 Drum 2
DIP Switches #1, #2, #6, #8 ON
ON
1
2
3
Figure 6-165 Drum 2 Motor Test (RQ Transport) 1
3. Set the DIP Switches of the RQ Unit as below
(Figure 6-166).
Figure 6-166 Drum 2
DIP Switches #7, #8 ON
ON
1
2
3
Figure 6-166 Drum 2 Motor Test (RQ Transport) 2
P/N 960-000213R_Rev.A
UBA Pro RT/RQ™ Series Banknote Recycler
Green
ON
OFF
4
5
6
7
8
to end the
ON
4
5
6
7
8
4
5
6
7
8
4. Apply electrical power.
5. Confirm that the Status LED/Collect Button is lit
at
Green
Color and then turns off.
NOTE: Wait for the Status LED to turn off
in order to run the test properly.
Figure 6-167 Drum 2 Motor
Figure 6-167 Drum 2 Motor Test (RQ Transport) 3
6. To start the Test, set the UBA Pro DIP Switch #8
to
(Figure 6-168)
OFF
Figure 6-168 Drum 2
DIP Switch #8 OFF
ON
1
2
3
Figure 6-168 Drum 2 Motor Test (RQ Transport) 4
7. The Drum 2 of the Recycler will start winding
the Tape until it reaches to "End" and then to
"Full" position back and forward repeatedly.
8. Set the UBA Pro DIP Switch #8 to
test.
© 2020, JAPAN CASH MACHINE CO., LTD.
6 - 3 0
Calibration and Testing
Green
ON
OFF
4
5
6
7
8
to end the
ON

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Uba pro rq series

Table of Contents