Calibration and Testing
Launch Performance Test Program
To launch the Performance Test program, proceed
as follows:
1. Remove electrical power.
2. Set each DIP Switch of the UBA Pro and the RT/
RQ as below (Figure 6-28).
Figure 6-28 Launch Performance Test Program
DIP Switch #8 ON
ON
1
2
3
DIP Switches All OFF
ON
1
2
3
Figure 6-28 Launch Performance Test Program 1
3. Connect the Unit to the PC.
(Refer to Figure 6-1 for the Tool Requirements
and Harness Connector locations).
4. Apply electrical power to the Unit.
5. The UBA Pro's
be lit.
6. Launch the "
JCM Tool Suite Standard Edition
Application.
7. Click and hold-down the "
Down Menu.
8. Select "
Performance Test
Figure 6-29 Launch Performance Test Program
Figure 6-29 Launch Performance Test Program 2
9. The Performance Test Main Screen will appear
(Figure 6-30).
Figure 6-30 Launch Performance Test Program
Figure 6-30 Launch Performance Test Program 3
P/N 960-000213R_Rev.A
UBA Pro RT/RQ™ Series Banknote Recycler
4
5
6
7
8
4
5
6
7
8
Green
and
Red
Status LEDs will
" Pull-
Service Mode
" (Figure 6-29 a).
a
Status LED Test
To perform the Status LED Test, proceed as fol-
lows:
1. Launch the Performance Test Program (see
page 6-7).
2. Select "
RC_COLLECT_AND_LED_TEST
ure 6-31 a).
3. Click the "
Start
31 b) to begin the Test.
Figure 6-31 Status LED Test 1
a
Figure 6-31 Status LED Test 1
4. Press the Status LED/Collect Button (Figure 6-32
a).
5. Confirm that the Status LED is lit in the follow-
ing sequential order each time when pressing the
"
Status LED/Collect Button:
Green
=> Magenta
=> Yellow
OFF
Figure 6-32 Status LED Test 2
Figure 6-32 Status LED Test 2
6. Click the "
Stop
33 a) to end the test.
Figure 6-33 Status LED Test 3
Figure 6-33 Status LED Test 3
© 2020, JAPAN CASH MACHINE CO., LTD.
6 - 7
" (Fig-
"
Screen Button (Figure 6-
b
=> Cyan
=> Blue
=> Red
=> White
a
"
Screen Button (Figure 6-
a
Section 6
=>