4 DISASSEMBLY/REASSEMBLY
This section provides disassembly and reassembly
instructions for the UBA Pro RT/RQ™ Series
Banknote Recycler (RT/RQ).
This section contains the following information:
•
Tool Requirements
•
UBA Pro Unit, Recycler and Cash Box Removal
•
RT Transport Unit Removal
•
RQ Transport Unit Removal
•
RT Frame Unit Removal
•
RQ Frame Unit Removal
•
RT Frame Unit Disassembly
•
RQ Frame Unit Disassembly
•
RT/RQ Frame Unit Disassembly In Common
•
Recycler Disassembly
NOTE: Calibration is required after
reassembly (Refer to "Calibration and
Testing" on page 6-1).
Tool Requirements
The following tools will be required to perform
disassembly and reassembly.
•
#1 Phillips Screwdriver
•
Flat Blade Screwdriver
•
E-Ring Holder
•
Tweezer
UBA Pro Unit, Recycler and Cash
Box Removal
To remove the UBA Pro Unit, Recycler and the
Cash Box out of the Frame, proceed as follows:
1. Pull the Lever (Figure 4-1 a) to release the lock.
2. Slide and remove the UBA Pro Unit (Figure 4-1
b) from the Frame (Figure 4-1 c) as illustrated by
the Arrow
.
①
3. Press down on the Release Lever (Figure 4-1 d)
of the Recycler (Figure 4-1 e) installed in the RT
Transport, and pull the Recycler out of the RT
Transport in the direction indicated by Arrow
4. Press up on the Release Lever (Figure 4-1 f) of
the Recycler (Figure 4-1 g) installed in the RQ
Transport, and pull the Recycler out of the RQ
Transport in the direction indicated by Arrow
5. Pull the Cash Box Handle (Figure 4-1 h) to
remove the Cash Box (Figure 4-1 i) from the
Frame (Figure 4-1 c) in the direction indicated by
Arrow
④
P/N 960-000213R_Rev.A
UBA Pro RT/RQ™ Series
Banknote Recycler
S e c t i o n 4
Figure 4-1 UBA Pro Unit, Recycler and Cash
Box Removal
a
d
f
h
Figure 4-1 UBA Pro Unit, Recycler and Cash Box
Removal
RT Transport Unit Removal
To remove the Transport Unit in the RT Transport,
proceed as follows:
1. Press down on the Front Transport Unit's Release
Lever (Figure 4-2 a).
2. Pull up the Front Transport Unit (Figure 4-2 b) as
illustrated by the Arrow
3. Pull the Release Lever (Figure 4-2 c).
4. Lift up and remove the Transport Unit (Figure 4-
2 d) as illustrated by the Arrow
Figure 4-2 RT Transport Unit Removal
b
a
.
②
d
.
③
c
Figure 4-2 RT Transport Unit Removal
© 2020, JAPAN CASH MACHINE CO., LTD.
4 - 1
b
①
②
③
e
④
g
i
.
①
.
②
①
②
c