Recycler Solenoid Test (Rt Transport); Drum 1 Motor Test (Rt Transport) - JCM GLOBAL UBA Pro RT Series Operation And Maintenance Manual

Banknote recycler
Table of Contents

Advertisement

Section 6

Recycler Solenoid Test (RT Transport)

To run the Recycler Solenoid on the RT Transport
side, proceed as follows:
1. Remove electrical power.
2. Set the DIP Switches of the UBA Pro Unit as
below (Figure 6-119).
Figure 6-119 Recycle
DIP Switches #1, #2, #6, #8 ON
ON
1
2
3
Figure 6-119 Recycle Solenoid Test
3. Set the DIP Switches of the RT/RQ Unit as below
(Figure 6-120).
Figure 6-120 Recycle
DIP Switch #5 ON
ON
1
2
3
Figure 6-120 Recycle Solenoid Test
(RT Transport) 2
4. Apply electrical power.
5. Confirm that the Status LED/Collect Button is lit
at
Green
Color and then turns off.
NOTE: Wait for the Status LED to turn off
in order to run the test properly.
Figure 6-121 Recycle Sole-
Figure 6-121 Recycle Solenoid Test
6. To start the Test, set the UBA Pro DIP Switch #8
to
(Figure 6-122).
OFF
Figure 6-122 Recycle
DIP Switch #8 OFF
ON
1
2
3
Figure 6-122 Recycle Solenoid
7. The Solenoid will start operating when it func-
tions properly.
NOTE: Confirm the functionality aurally by
the sound that the Solenoid is making
while in the operation.
8. Set the UBA Pro DIP Switch #8 to
test.
P/N 960-000213R_Rev.A
UBA Pro RT/RQ™ Series Banknote Recycler
4
5
6
7
8
(RT Transport) 1
4
5
6
7
8
Green
ON
OFF
(RT Transport) 3
4
5
6
7
8
Test (RT Transport) 4
to end the
ON

Drum 1 Motor Test (RT Transport)

To run the Recycler Solenoid on the RT Transport
side, proceed as follows:
1. Remove electrical power.
2. Set the DIP Switches of the UBA Pro Unit as
below (Figure 6-123).
Figure 6-123 Drum 1
DIP Switches #1, #2, #6, #8 ON
ON
1
2
3
Figure 6-123 Drum 1 Motor Test (RT Transport) 1
3. Set the DIP Switches of the RT/RQ Unit as below
(Figure 6-124).
Figure 6-124 Drum 1
DIP Switch #6 ON
ON
1
2
3
Figure 6-124 Drum 1 Motor Test (RT Transport) 2
4. Apply electrical power.
5. Confirm that the Status LED/Collect Button is lit
at
Green
Color and then turns off.
NOTE: Wait for the Status LED to turn off
in order to run the test properly.
Figure 6-125 Drum 1 Motor
Figure 6-125 Drum 1 Motor Test (RT Transport) 3
6. To start the Test, set the UBA Pro DIP Switch #8
to
(Figure 6-126).
OFF
Figure 6-126 Drum 1
DIP Switch #8 OFF
ON
1
2
3
Figure 6-126 Drum 1 Motor Test (RT Transport) 4
7. The Drum 1 of the Recycler will start winding
the Tape until it reaches to "End" and then to
"Full" position back and forward repeatedly.
8. Set the UBA Pro DIP Switch #8 to
test.
© 2020, JAPAN CASH MACHINE CO., LTD.
6 - 2 4
Calibration and Testing
4
5
6
7
8
4
5
6
7
8
Green
ON
OFF
4
5
6
7
8
to end the
ON

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Uba pro rq series

Table of Contents