Feed Motor Reverse Rotation Test (Rt Transport); Flapper Motor Test (Rt Transport) - JCM GLOBAL UBA Pro RT Series Operation And Maintenance Manual

Banknote recycler
Table of Contents

Advertisement

Calibration and Testing
Feed Motor Reverse Rotation Test 
(RT Transport)
To run the Feed Motor Reverse Rotation Test on
the RT Transport side, proceed as follows:
1. Remove electrical power.
2. Set the DIP Switches of the UBA Pro Unit as
below (Figure 6-96).
Figure 6-96 Feed
DIP Switches #1, #2, #6, #8 ON
ON
1
2
3
Figure 6-96 Feed Motor Reverse Rotation Test
(RT Transport) 1
3. Set the DIP Switches of the RT/RQ Unit as below
(Figure 6-97).
Figure 6-97 Feed
DIP Switch #2 ON
ON
1
2
3
Figure 6-97 Feed Motor Reverse Rotation Test
(RT Transport) 2
4. Apply electrical power.
5. Confirm that the Status LED/Collect Button is lit
at
Green
Color and then turns off.
NOTE: Wait for the Status LED to turn off
in order to run the test properly.
Figure 6-98 Feed Motor
Figure 6-98 Feed Motor Reverse Rotation Test
(RT Transport) 3
6. Remove the Recycler from the RT Transport.
Figure 6-99 Feed Motor
Figure 6-99 Feed Motor Reverse Rotation Test
(RT Transport) 3
P/N 960-000213R_Rev.A
UBA Pro RT/RQ™ Series Banknote Recycler
4
5
6
7
8
4
5
6
7
8
Green
ON
OFF
7. To start the Test, set the UBA Pro DIP Switch #8
to
(Figure 6-100).
OFF
Figure 6-100 Feed
DIP Switch #8 OFF
ON
1
2
3
Figure 6-100 Feed Motor Reverse Rotation
Test (RT Transport) 5
8. The Belts of the Transport Unit will start running
in the normal rotation direction when the Feed
Motor functions properly.
Figure 6-101 Fee
Figure 6-101 Feed Motor Reverse Rotation
Test (RT Transport) 6
9. Set the UBA Pro DIP Switch #8 to
test.

Flapper Motor Test (RT Transport)

To run the Flapper Motor Test on the RT Transport
side, proceed as follows:
1. Remove electrical power.
2. Set the DIP Switches of the UBA Pro Unit as
below (Figure 6-102).
Figure 6-102 Flapper
DIP Switches #1, #2, #6, #8 ON
ON
1
2
3
Figure 6-102 Flapper Motor Test (RT Transport) 1
3. Set the DIP Switches of the RT/RQ Unit as below
(Figure 6-103).
Figure 6-103 Flapper
DIP Switch #3 ON
ON
1
2
3
Figure 6-103 Flapper Motor Test (RT Transport) 2
© 2020, JAPAN CASH MACHINE CO., LTD.
6 - 2 1
Section 6
4
5
6
7
8
to end the
ON
4
5
6
7
8
4
5
6
7
8

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Uba pro rq series

Table of Contents