Calibration and Testing
Feed Motor Speed Reverse Rotation Test (RQ
Transport)
To perform the Feed Motor Speed Test in the
reserve rotation on the RQ Transport side, proceed
as follows:
1. Ensure that the Recycler and Cash Box is prop-
erly installed.
2. Launch the Performance Test Program (see
page 6-7).
3. Select "
QUAD_FEED_MOTOR_REV_TEST
(Figure 6-55 a).
4. Click the "
"
Start
55 b) to begin the Test.
Figure 6-55 Feed Motor Speed Reverse
Rotation Test (RQ Transport) 1
Scroll
a
Figure 6-55 Feed Motor Speed Reverse Rotation
Test (RQ Transport) 1
5. The measured speed will appear in the "
Motor (RC-Quad)
Screen.
6. Confirm that the motor speed is in the acceptable
range: 600mm/sec to 900mm/sec
7. Click the "
"
Stop
56 b) to end the test.
Figure 6-56 Feed Motor Speed Reverse
b
a
Figure 6-56 Feed Motor Speed Reverse Rotation
Test (RQ Transport) 2
P/N 960-000213R_Rev.A
UBA Pro RT/RQ™ Series Banknote Recycler
Screen Button (Figure 6-
b
RC-Feed
" area (Figure 6-56 a) on the
Screen Button (Figure 6-
Flapper Motor Operation Time Test (RQ
Transport)
To perform the Flapper Motor Operation Time Test
on the RQ Transport side, proceed as follows:
1. Launch the Performance Test Program (see
page 6-7).
2. Select "
QUAD_FLAPPER_MOTOR_TEST
ure 6-57 a).
3. Click the "
57 b) to begin the Test.
"
Figure 6-57 Flapper Motor Operation Time Test
a
Figure 6-57 Flapper Motor Operation Time Test
(RQ Transport) 1
4. The measured time will appear in the "
per (RC-Quad)
Screen.
5. Confirm that the operation time is in the accept-
able range: 300msec to 950msec.
6. Click the "
58 b) to end the test.
Figure 6-58 Flapper Motor Operation Time Test
Figure 6-58 Flapper Motor Operation Time Test
(RQ Transport) 2
© 2020, JAPAN CASH MACHINE CO., LTD.
6 - 1 3
"
Screen Button (Figure 6-
Start
b
Scroll
" area (Figure 6-58 a) on the
"
Screen Button (Figure 6-
Stop
b
a
Section 6
" (Fig-
RC-Flap-
Scroll