Section 6

DIP Switch Test

To perform the DIP Switch Test, proceed as fol-
lows:
1. Launch the Performance Test Program (see
page 6-7).
2. Select "
RC_DIPSWTICH_TEST
3. Click the "
"
Start
34 b) to begin the Test.
Figure 6-34 DIP Switch Test 1
b
a
Figure 6-34 DIP Switch Test 1
4. Set the RT/RQ's DIP Switch #1 through #8 to
and
.
OFF
Figure 6-35 DIP Switch Test 2
DIP Switches #1 - #8 ON or OFF
ON
1
2
3
Figure 6-35 DIP Switch Test 2
5. The resulting indication will appear in the "
" area (Figure 6-36 a) on the Screen.
Dip switch
6. Confirm that indication changes "
"
" as the Switch is set.
OFF
7. Click the "
"
Stop
36 b) to end the test.
Figure 6-36 DIP Switch Test 3
a
Figure 6-36 DIP Switch Test 3
P/N 960-000213R_Rev.A
UBA Pro RT/RQ™ Series Banknote Recycler
" (Figure 6-34 a).
Screen Button (Figure 6-
4
5
6
7
8
" and
ON
Screen Button (Figure 6-
b

RT Transport Performance Tests

This section provides instructions for conducting a
Performance Test Using a PC on the RT Transport
side (
Figure 6-27
Feed Motor Speed Forward Rotation Test (RT
Transport)
To perform the Feed Motor Speed Test in the for-
ward rotation on the RT Transport side, proceed as
follows:
1. Ensure that the Recycler and Cash Box is prop-
erly installed.
2. Launch the Performance Test Program (see
page 6-7).
3. Select "
TWIN_FEED_MOTOR_FWD_TEST
(Figure 6-37 a).
4. Click the "
37 b) to begin the Test.
Figure 6-37 Feed Motor Speed Forward
Rotation Test (RT Transport) 1
ON
Figure 6-37 Feed Motor Speed Forward Rotation
Test (RT Transport) 1
5. The measured speed will appear in the "
Motor (RC-Twin)
Screen.
6. Confirm that the motor speed is in the acceptable
range: 600mm/sec to 900mm/sec.
RC-
7. Click the "
38 b) to end the test.
Figure 6-38 Feed Motor Speed Forward
Figure 6-38 Feed Motor Speed Forward Rotation
Test (RT Transport) 2
6 - 8
Calibration and Testing
a).
"
Screen Button (Figure 6-
Start
b
a
" area (Figure 6-38 a) on the
"
Screen Button (Figure 6-
Stop
b