Rq Transport Unit Removal; Rt Frame Unit Removal; Figure 4-3 Rq Transport Unit Removal 1; Figure 4-4 Rq Transport Unit Removal 2 - JCM GLOBAL UBA Pro RT Series Operation And Maintenance Manual

Banknote recycler
Table of Contents

Advertisement

Section 4

RQ Transport Unit Removal

To remove the Transport Unit in the RQ Transport,
proceed as follows:
1. Press up on the Front Transport Unit's Release
Lever (Figure 4-3 a).
2. Pull down the Front Transport Unit (Figure 4-3 b)
as illustrated by the Arrow.

Figure 4-3 RQ Transport Unit Removal 1

b
a
Figure 4-3 RQ Transport Unit Removal 1
3. Press down on the Transport Unit's Release
Lever (Figure 4-4 a).
4. Pull down and remove the Transport Unit (Figure
4-4 b) as illustrated by the Arrow.

Figure 4-4 RQ Transport Unit Removal 2

b
a
Figure 4-4 RQ Transport Unit Removal 2
P/N 960-000213R_Rev.A
UBA Pro RT/RQ™ Series Banknote Recycler

RT Frame Unit Removal

To remove the RT Frame Unit, proceed as follows:

Figure 4-5 RT Frame Unit Removal 1

Figure 4-6 RT Frame Unit Removal 2

4 - 2
1. Remove the seven (7) Screws (Figure 4-5
through
a
).
7
a
7
a
4
a
3
a
5
a
Figure 4-5 RT Frame Unit Removal 1
2. Remove the two (2) Screws (Figure 4-6
3. Slide and remove the Frame Rear Cover (Figure
4-6 b) as illustrated by Arrow.
Figure 4-6 RT Frame Unit Removal 2
4. Unplug the single (1) Connector (Figure 4-7 a).
5. Unplug the two (2) FPC Harnesses (Figure 4-7
&
b
).
2
6. Remove the two (2) Screws (Figure 4-7
© 2020, JAPAN CASH MACHINE CO., LTD.
Disassembly/Reassembly
a
1
6
a
2
a
1
a
&
a
).
1
2
b
a
2
a
1
b
1
c
&
c
).
1
2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Uba pro rq series

Table of Contents