JCM GLOBAL UBA Pro RT Series Operation And Maintenance Manual page 52

Banknote recycler
Table of Contents

Advertisement

Section 2
Sym.
A
Note Position Sensor A (RT Transport)
B
Note Position Sensor B (RT Transport)
C
Note Position Sensor C (RT Transport)
D
Note Position Sensor D (RQ Transport)
E
Note Position Sensor E (RQ Transport)
F
Note Position Sensor F (RQ Transport)
Drum 1 Tape Full Empty Sensor 1 
1
(RT/RQ Transport)
G
Drum 2 Tape Full Empty Sensor 2 
2
(RT/RQ Transport)
H
Exit Prism
1
Note Position Sensor 1 (RT Transport)
2
Note Position Sensor 2 (RT Transport)
Note Position Sensor 3 (RT Transport)
3
*This sensor is not visible.
I
4
Note Position Sensor 4 (RQ Transport)
5
Note Position Sensor 5 (RQ Transport)
6
Note Position Sensor 6 (RQ Transport)
NOTE: Wipe and clean all of the
slightly damp, lint-free, Micro-fiber cloth. Do not allow liquids or fluids to drip into the Unit, to
minimize the risk of damage or improper performance.
P/N 960-000213R_Rev.A
UBA Pro RT/RQ™ Series Banknote Recycler
Table 2-12 RT/RQ Sensors and Cleaning Methods
Sensors
Green
colored Rollers and Belts shown in Figure 2-30 using a
2 - 1 8
Cleaning Method
Wipe clean using a dry, lint free cloth, cotton
swab.
Clean using non-flammable Compressed Air.
Wipe clean using a dry, lint free cloth, cotton
swab.
Wipe clean using a dry, lint free cloth, cotton
swab.
Clean using non-flammable Compressed Air.
Wipe clean using a dry, lint free cloth, cotton
swab.
© 2020, JAPAN CASH MACHINE CO., LTD.
Installation

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Uba pro rq series

Table of Contents