Rq Frame Unit Removal; Rt Frame Unit Disassembly; Cpu Board Removal; Figure 4-7 Rt Frame Unit Removal 3 - JCM GLOBAL UBA Pro RT Series Operation And Maintenance Manual

Banknote recycler
Table of Contents

Advertisement

Disassembly/Reassembly
7. Slide and remove the Frame Rear Cover (Figure
4-7 d) as illustrated by Arrow.

Figure 4-7 RT Frame Unit Removal 3

Figure 4-7 RT Frame Unit Removal 3
8. Remove the RT Frame Unit (Figure 4-8 a) as
illustrated.

Figure 4-8 RT Frame Unit Removal 4

Figure 4-8 RT Frame Unit Removal 4
P/N 960-000213R_Rev.A
UBA Pro RT/RQ™ Series Banknote Recycler

RQ Frame Unit Removal

To remove the RQ Frame Unit, proceed as follows:
b
1
b

Figure 4-9 RQ Frame Unit Removal 1

2
a
d
c
2
c
1

Figure 4-10 RQ Frame Unit Removal 2

a

RT Frame Unit Disassembly

CPU Board Removal

To remove the CPU Board, proceed as follows:
4 - 3
1. Remove the four (4) Screws (Figure 4-9
through
a
).
4
a
2
a
1
Figure 4-9 RQ Frame Unit Removal 1
2. Remove the RQ Frame Unit as illustrated (Figure
4-10 a).
Figure 4-10 RQ Frame Unit Removal 2
1. Unplug the three (3) Connectors (Figure 4-11
through
a
).
3
© 2020, JAPAN CASH MACHINE CO., LTD.
Section 4
a
1
a
4
a
3
a
a
1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Uba pro rq series

Table of Contents