Operational Flowcharts; Rt/Rq Main Flow Process - JCM GLOBAL UBA Pro RT Series Operation And Maintenance Manual

Banknote recycler
Table of Contents

Advertisement

Installation

Operational Flowcharts

RT/RQ Main Flow Process

Figure 2-34 RT/RQ Main Flow Process
Power On
a
b
c
NO
e
f
NO
g
NO
h
NO
A
P/N 960-000213R_Rev.A
UBA Pro RT/RQ™ Series Banknote Recycler
A
YES
d
YES
B1
YES
B2
YES
B3
Figure 2-34 RT/RQ Main Flow Process
Apply Power to the Unit.
a) Initializing
A) Return from "h" or "d" in this flowchart
b) Stand-by
c) Inhibit acceptance?
d) Status LED is OFF
e) Status LED is ON
f) Taking the Banknote in?
B1) To "B1" Accepting Banknotes flowchart (Figure 2-35)
g) Dispensing the Banknote?
B2) To "B2" Dispensing Banknotes flowchart 
(Figure 2-38)
h) Collecting the Banknote?
B3) To "B3" Collecting in Cash Box flowchart 
(Figure 2-40)
A) Return To "A" in this flowchart
© 2020, JAPAN CASH MACHINE CO., LTD.
2 - 2 1
Section 2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Uba pro rq series

Table of Contents