Sponge Roller Assy. Removal (Drum 2 Side) - JCM GLOBAL UBA Pro RT Series Operation And Maintenance Manual

Banknote recycler
Table of Contents

Advertisement

Section 4
7. Remove the two (2) E-rings (Figure 4-112
a
), the two (2) Clutch Gears (Figure 4-112
2
b
) and the three (3) Bearings (Figure 4-112
2
through
c
)
3
8. Remove the single (1) Shaft (Figure 4-112 d).
Figure 4-112 Sole-
d
c
3
Figure 4-112 Solenoid Removal 6
9. Remove the Shaft Assy. (Figure 4-113 a).
Figure 4-113 Sole-
a
Figure 4-113 Solenoid Removal 7
10. Remove the two (2) E-rings (Figure 4-114
a
) and the two (2) Bearings (Figure 4-114
2
b
).
2
11. Remove the two (2) Screws (Figure 4-114
c
) to remove the Frame Assy. (Figure 4-114 d).
2
Figure 4-114 Sole-
d
c
c
2
1
a
1
a
2
Figure 4-114 Solenoid Removal 8
P/N 960-000213R_Rev.A
UBA Pro RT/RQ™ Series Banknote Recycler
a
&
1
b
&
1
c
1
c
b
1
1
a
1
c
a
2
2
b
2
a
&
1
b
&
1
c
&
1
b
1
b
2
12. Remove the single (1) Screw (Figure 4-115 a) to
remove the Solenoid (Figure 4-115 b).
Figure 4-115 Sole-
Figure 4-115 Solenoid Removal 9
Sponge Roller Assy. Removal (Drum 2
Side)
To remove the Sponge Roller Assy. from the Drum
2 Side, proceed as follows:
1. Remove the four (4) Screws (Figure 4-116
through
a
).
4
Figure 4-116 Sponge
a
Drum 2 Side
1
a
2
Figure 4-116 Sponge Roller Assy. Removal
(Drum 2 Side) 1
2. Remove the Course Guide (Figure 4-117 a).
Figure 4-117 Sponge
a
Figure 4-117 Sponge Roller Assy. Removal
(Drum 2 Side) 2
© 2020, JAPAN CASH MACHINE CO., LTD.
4 - 2 2
Disassembly/Reassembly
b
a
a
1
a
4
a
3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Uba pro rq series

Table of Contents