JCM GLOBAL UBA Pro RT Series Operation And Maintenance Manual page 26

Banknote recycler
Table of Contents

Advertisement

Section 1
Sym.
A
Acceptor Head Unit (UBA Pro)
B
Upper Guide Access Lever
C
Bezel
D
Acceptor Head Unit Release Lever
1 DIP Switches (Front)
2 UBA Pro Status LED (Orange)
3 USB Type-C Connector (Maintenance)
E
4 UBA Pro Status LED (Green)
5 UBA Pro Status LED (Red)
6 Bezel Connector
1 SW1 (Bottom) for the Interface Settings
F
2 SW2 (Bottom) for the Recycler Settings
1 Interface Connector
G
2 Power Connector
3 DIP Switches (Rear)
*. With the Collect Button (Status LED), the Banknotes are sent from the Recycler into the Cash Box. Refer to "Collecting Banknotes into the Cash Box by the Collect Button" on
page 2-11.
†. Refer to "SW1 and SW2 Configurations" on page 2-4 for the detailed DIP Switch Settings.
P/N 960-000213R_Rev.A
UBA Pro RT/RQ™ Series Banknote Recycler
Table 1-4 RT/RQ Component Names
Description
Sym.
H
Recycler (RT Transport)
1
H
Recycler (RQ Transport)
2
I
Cash Box
1 Transport Unit
J
2 Front Transport Unit
1 Recycler Lock
2 Recycler LED
K
3 Transport LED
4 Status LED/Collect Button
L
RT Transport
M
RQ Transport
N
Recycler Release Lever
O
Drum 1 Shaft
P
Drum 2 Shaft
© 2020, JAPAN CASH MACHINE CO., LTD.
1 - 6
General Information
Description
*
-

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Uba pro rq series

Table of Contents