Drum 2 Motor Test (Rt Transport); Rq Transport Performance Tests - JCM GLOBAL UBA Pro RT Series Operation And Maintenance Manual

Banknote recycler
Table of Contents

Advertisement

Calibration and Testing

Drum 2 Motor Test (RT Transport)

To run the Recycler Solenoid on the RT Transport
side, proceed as follows:
1. Remove electrical power.
2. Set the DIP Switches of the UBA Pro Unit as
below (Figure 6-125).
Figure 6-127 Drum 2
DIP Switches #1, #2, #6, #8 ON
ON
1
2
3
Figure 6-127 Drum 2 Motor Test (RT Transport) 1
3. Set the DIP Switches of the RT/RQ Unit as below
(Figure 6-128).
Figure 6-128 Drum 2
DIP Switch #7 ON
ON
1
2
3
Figure 6-128 Drum 2 Motor Test (RT Transport) 2
4. Apply electrical power.
5. Confirm that the Status LED/Collect Button is lit
at
Green
Color and then turns off.
NOTE: Wait for the Status LED to turn off
in order to run the test properly.
Figure 6-129 Drum 2 Motor
Figure 6-129 Drum 2 Motor Test (RT Transport) 3
6. To start the Test, set the UBA Pro DIP Switch #8
to
(Figure 6-130).
OFF
Figure 6-130 Drum 2
DIP Switch #8 OFF
ON
1
2
3
Figure 6-130 Drum 2 Motor Test (RT Transport) 4
7. The Drum 2 of the Recycler will start winding
the Tape until it reaches to "End" and then to
"Full" position back and forward repeatedly.
8. Set the UBA Pro DIP Switch #8 to
test.
P/N 960-000213R_Rev.A
UBA Pro RT/RQ™ Series Banknote Recycler
4
5
6
7
8
4
5
6
7
8
Green
ON
OFF
4
5
6
7
8
to end the
ON

RQ Transport Performance Tests

This section provides instructions for conducting a
Performance Test Without a PC on the RQ Trans-
port side (Figure 6-71 b).
Feed Motor Normal Rotation Test 
(RQ Transport)
To run the Feed Motor Normal Rotation Test on the
RQ Transport side, proceed as follows:
1. Remove electrical power.
2. Set the DIP Switches of the UBA Pro Unit as
below (Figure 6-131).
Figure 6-131 Feed
DIP Switches #1, #2, #6, #8 ON
ON
1
2
3
Figure 6-131 Feed Motor Normal Rotation Test
(RQ Transport) 1
3. Set the DIP Switches of the RQ Unit as below
(Figure 6-132).
Figure 6-132 Feed
DIP Switches #1, #8 ON
ON
1
2
3
Figure 6-132 Feed Motor Normal Rotation Test
(RQ Transport) 2
4. Apply electrical power.
5. Confirm that the Status LED/Collect Button is lit
at
Green
Color and then turns off.
NOTE: Wait for the Status LED to turn off
in order to run the test properly.
Figure 6-133 Feed Motor Nor-
Figure 6-133 Feed Motor Normal Rotation Test
(RQ Transport) 3
© 2020, JAPAN CASH MACHINE CO., LTD.
6 - 2 5
Section 6
4
5
6
7
8
4
5
6
7
8
OFF
Green
ON

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Uba pro rq series

Table of Contents