JCM GLOBAL UBA Pro RT Series Operation And Maintenance Manual page 88

Banknote recycler
Table of Contents

Advertisement

Section 4
2. Remove the two (2) E-rings (Figure 4-124
a
), the two (2) Bobbin Gears (Figure 4-124
2
b
), the two (2) Parallel Pins (Figure 4-124
2
c
) and the two (2) Bearings (Figure 4-124
2
d
).
2
3. Remove the Frame Motor Assy. (Figure 4-124 e).
Figure 4-124 Motor
a
a
1
b
1
c
1
d
1
Figure 4-124 Motor Harness Assy. Removal 2
4. Remove the three (3) Screws (Figure 4-125
through
a
) to remove the Motor Cover Assy.
3
(Figure 4-125 b).
Figure 4-125 Motor
a
Figure 4-125 Motor Harness Assy. Removal 3
P/N 960-000213R_Rev.A
UBA Pro RT/RQ™ Series Banknote Recycler
2
b
2
c
2
d
2
e
a
2
a
3
1
b
a
&
5. Remove the single (1) Harness Cover (Figure 4-
1
126 a).
b
&
1
6. Push the Pin (Figure 4-126 b) to remove the
c
&
1
Motor Assy. (Figure 4-126 c) out of the Case.
d
&
1
Figure 4-126 Motor
a
Figure 4-126 Motor Harness Assy. Removal 4
7. Remove the single (1) Outer Gear (Figure 4-127
a).
a
1
8. Remove the two (2) Screws (Figure 4-127
b
) and disassemble the Motor Assy. as illus-
2
trated.
9. Remove the Motor Harness Assy. (Figure 4-127
c).
Figure 4-127 Motor
Figure 4-127 Motor Harness Assy. Removal 5
4 - 2 4
Disassembly/Reassembly
c
b
a
b
1
b
2
c
© 2020, JAPAN CASH MACHINE CO., LTD.
b
&
1
Motor (x2)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Uba pro rq series

Table of Contents