Section 4
2. Remove the four (4) Screws (Figure 4-23
through
a
).
4
Figure 4-23 Front Transport Unit Removal (RT
a
1
a
2
a
3
a
4
Figure 4-23 Front Transport Unit Removal
(RT Frame Unit) 2
3. Feed the Harness (Figure 4-24 a) out through the
hole (Figure 4-24 b) to remove the Frame Assy.
(Figure 4-24 c).
Figure 4-24 Front Transport Unit Removal (RT
d
a
b
c
Figure 4-24 Front Transport Unit Removal
(RT Frame Unit) 3
NOTE: For the reassembly, route the
Harness as illustrated in Figure 4-24d.
4. Feed the Harness (Figure 4-25 a) out through the
hole (Figure 4-25 b), and remove the Front
Transport Unit (Figure 4-25 c).
P/N 960-000213R_Rev.A
UBA Pro RT/RQ™ Series Banknote Recycler
a
1
Figure 4-25 Front Transport Unit Removal (RT
Rear Transport Unit Removal
To remove the Rear Transport Unit out of the RT
Frame Unit, proceed as follows:
Figure 4-26 Rear Transport Unit Removal (RT
4 - 6
5. Remove the Rotary Guide (Figure 4-25 d).
a
c
d
Figure 4-25 Front Transport Unit Removal
(RT Frame Unit) 4
NOTE: For the reassembly, route the
Harness as illustrated in Figure 4-25e.
1. Remove the four (4) Screws (Figure 4-26
through
a
).
4
2. Feed the Harness (Figure 4-26 b) out through the
hole (Figure 4-26 c), and remove the Right Side
Frame Assy. (Figure 4-26 d).
b
d
Figure 4-26 Rear Transport Unit Removal
(RT Frame Unit) 1
© 2020, JAPAN CASH MACHINE CO., LTD.
Disassembly/Reassembly
e
b
a
1
c
a
4
a
3
a
2
a
1