Section 6
4. Apply electrical power.
5. Confirm that the Status LED/Collect Button is lit
at
Green
Color and then turns off.
NOTE: Wait for the Status LED to turn off
in order to run the test properly.
Figure 6-149 Note Position
Figure 6-149 Note Position Sensor 4 - 6 Test
(RQ Transport) 3
6. To start the Test, set the UBA Pro DIP Switch #8
to
(Figure 6-150).
OFF
Figure 6-150 Note
DIP Switch #8 OFF
ON
1
2
3
Figure 6-150 Note Position Sensor 4 - 6 Test
(RQ Transport) 4
7. Remove the Recycler from the RQ Transport.
8. Pull down the Front Transport Unit to block the
Note Position Sensor 4 through 6.
Figure 6-151 Note Position
Figure 6-151 Note Position Sensor 4 - 6 Test
(RQ Transport) 5
9. The RQ Unit's Status LED will be lit at Cyan
when the Sensors function properly.
10. Set the UBA Pro DIP Switch #8 to
test.
P/N 960-000213R_Rev.A
UBA Pro RT/RQ™ Series Banknote Recycler
Green
ON
OFF
4
5
6
7
8
to end the
ON
Note Position Sensor D - F Test 
(RQ Transport)
To run the Note Position Sensor D - F Test on the
RQ Transport side, proceed as follows:
1. Remove electrical power.
2. Set the DIP Switches of the UBA Pro Unit as
below (Figure 6-152).
Figure 6-152 Note
DIP Switches #1, #2, #6, #8 ON
ON
1
2
3
Figure 6-152 Note Position Sensor D - F Test
(RQ Transport) 1
3. Set the DIP Switches of the RQ Unit as below
(Figure 6-153).
Figure 6-153 Note
DIP Switches #1, #4, #8 ON
ON
1
2
3
Figure 6-153 Note Position Sensor D - F Test
(RQ Transport) 2
4. Apply electrical power.
5. Confirm that the Status LED/Collect Button is lit
at
Green
Color and then turns off.
NOTE: Wait for the Status LED to turn off
in order to run the test properly.
Figure 6-154 Note Position
Figure 6-154 Note Position Sensor D - F Test
(RQ Transport) 3
6. To start the Test, set the UBA Pro DIP Switch #8
to
(Figure 6-155).
OFF
Figure 6-155 Note
DIP Switch #8 OFF
ON
1
2
3
Figure 6-155 Note Position Sensor D - F Test
(RQ Transport) 4
© 2020, JAPAN CASH MACHINE CO., LTD.
6 - 2 8
Calibration and Testing
4
5
6
7
8
4
5
6
7
8
Green
ON
OFF
4
5
6
7
8