JCM GLOBAL UBA Pro RT Series Operation And Maintenance Manual

JCM GLOBAL UBA Pro RT Series Operation And Maintenance Manual

Banknote recycler
Table of Contents

Advertisement

Website: http://www.jcmglobal.com
UBA Pro RT/RQ
Series
Banknote Recycler
Operation and Maintenance
Manual
(Revision A)
P/N 960-000213R_Rev.A
Issue #4115-SME-01-00
© 2020, JAPAN CASH MACHINE CO., LTD.

Advertisement

Table of Contents
loading

Summary of Contents for JCM GLOBAL UBA Pro RT Series

  • Page 1 Website: http://www.jcmglobal.com UBA Pro RT/RQ Series ™ Banknote Recycler  Operation and Maintenance Manual (Revision A) P/N 960-000213R_Rev.A Issue #4115-SME-01-00 © 2020, JAPAN CASH MACHINE CO., LTD.
  • Page 2 UBA Pro RT/RQ™ Series Banknote Recycler Operation and Maintenance Manual Issue #4115-SME-01-00 REVISION HISTORY Rev №. Date Reason for Update Jan. 29, 2020 Initial Release Electrical Current Symbol Direct Current: indicates Direct Current values on product labels. International Compliance • RoHS Directive •...
  • Page 3: Table Of Contents

    UBA Pro RT/RQ™ Series Banknote Recycler Table of Contents Page 1 GENERAL INFORMATION ..................1-1 RT and RQ Units......................1-1 Model Descriptions ......................1-2 Type Descriptions ......................1-2 Software Descriptions ....................1-2 Precautions........................1-2 User Cautions ........................1-3 Installation Cautions........................1-3 Mounting, Dismounting &...
  • Page 4 UBA Pro RT/RQ™ Series Banknote Recycler Table of Contents Page Bottom Installation (For Standard Installation Type Only)..........2-2 Bezel Installation ......................2-2 External Harness Installation ................... 2-2 Cash Box Lock Installation....................2-3 Unlock Procedure......................2-3 DIP Switch Configurations .................... 2-4 Denomination Acceptance Settings (DIP Switches at the front) ........
  • Page 5 UBA Pro RT/RQ™ Series Banknote Recycler Table of Contents Page Americas .......................... 3-1 JCM American ..........................3-1 Europe, Middle East, Africa & Russia ................3-1 JCM Europe GmbH........................3-1 UK & Ireland........................3-1 JCM Europe (UK Office) ......................3-1 Asia and Oceania......................3-1 JCM Gold (HK) Ltd........................
  • Page 6 UBA Pro RT/RQ™ Series Banknote Recycler Table of Contents Page Timing Belt Removal (Transport Unit)................4-17 Recycler Disassembly ....................4-18 Recycler Board Removal ....................4-18 Tape Board Removal ..................... 4-19 Drum Unit Disassembly....................4-19 Sponge Roller Assy. Removal (Drum 1 Side) ..............4-20 Rubber Pulley and Drive Roller Removal (Drum 1 Side) ..........
  • Page 7 UBA Pro RT/RQ™ Series Banknote Recycler Table of Contents Page Solenoid Test (RQ Transport) ....................6-15 Drum 1 Motor Speed Test (RQ Transport) ................6-15 Drum 2 Motor Speed Test......................6-16 Performance Test without a PC .................. 6-17 List of the Performance Tests without a PC..............6-17 Communication Test ......................
  • Page 8 UBA Pro RT/RQ™ Series Banknote Recycler Table of Contents Page RT (Twin) Frame Unit (for RT and RQ) Parts List 8............7-15 RQ (Quad) Frame Unit Exploded View 1 ..............7-16 RQ (Quad) Frame Unit Parts List 1................7-16 RQ (Quad) Frame Unit Exploded View 2 ..............7-17 RQ (Quad) Frame Unit Parts List 2................
  • Page 9 UBA Pro RT/RQ™ Series Banknote Recycler Table of Contents Page Recycler Exploded View 7................... 7-50 Recycler Parts List 7 ...................... 7-51 Recycler Exploded View 8................... 7-52 Recycler Parts List 8 ...................... 7-53 Recycler Exploded View 9................... 7-54 Recycler Parts List 9 ...................... 7-55 Recycler Exploded View 10..................
  • Page 10 THIS PAGE INTENTIONALLY LEFT BLANK P/N 960-000213R_Rev.A © 2020, JAPAN CASH MACHINE CO., LTD. v i i i...
  • Page 11 UBA Pro RT/RQ™ Series Banknote Recycler List of Figures Page Figure 1-1 RQ and RT Units ....................1-1 Figure 1-2 Precautionary Symbols ..................1-2 Figure 1-3 Unacceptable Banknotes .................. 1-4 Figure 1-4 RT/RQ Component Locations ................1-5 RT Unit With SH2 Box Outside Dimension and Installation/Maintenance  Figure 1-5 Space Requirement ..................
  • Page 12 UBA Pro RT/RQ™ Series Banknote Recycler List of Figures Page Figure 2-38 RT/RQ Normal Dispensing Flow Process ............2-25 Figure 2-39 RT/RQ Abnormal Dispensing Flow Process ........... 2-26 Figure 2-40 RT/RQ Collecting in Cash Box Flow Process 1 ..........2-26 Figure 2-41 RT/RQ Collecting in Cash Box Flow Process 2 ..........
  • Page 13 UBA Pro RT/RQ™ Series Banknote Recycler List of Figures Page Figure 4-49 Quad Board Removal 1 .................. 4-10 Figure 4-50 Quad Board Removal 2 .................. 4-11 Figure 4-51 Flap Board Removal (RQ Frame Unit) 1 ............4-11 Figure 4-52 Flap Board Removal (RQ Frame Unit) 2 ............4-11 Figure 4-53 Flap Home Board Removal (RQ Frame Unit) 1 ..........
  • Page 14 UBA Pro RT/RQ™ Series Banknote Recycler List of Figures Page Figure 4-101 Sponge Roller Assy. Removal (Drum 1 Side) 3 ..........4-20 Figure 4-102 Sponge Roller Assy. Removal (Drum 1 Side) 4 ..........4-20 Figure 4-103 Sponge Roller Assy. Removal (Drum 1 Side) 5 ..........4-20 Figure 4-104 Sponge Roller Assy.
  • Page 15 UBA Pro RT/RQ™ Series Banknote Recycler List of Figures Page Figure 6-21 Sensor Calibration 1 ..................6-5 Figure 6-22 Sensor Calibration 2 ..................6-5 Figure 6-23 Sensor Calibration 3 ..................6-5 Figure 6-24 Sensor Calibration 4 ..................6-5 Figure 6-25 Sensor Calibration 5 ..................
  • Page 16 UBA Pro RT/RQ™ Series Banknote Recycler List of Figures Page Figure 6-73 Communication Test 2 ..................6-18 Figure 6-74 Communication Test 3 ..................6-18 Figure 6-75 Communication Test 4 ..................6-18 Figure 6-76 Status LED Test 1 ................... 6-18 Figure 6-77 Status LED Test 2 ...................
  • Page 17 UBA Pro RT/RQ™ Series Banknote Recycler List of Figures Page Figure 6-125 Drum 1 Motor Test (RT Transport) 3 .............. 6-24 Figure 6-126 Drum 1 Motor Test (RT Transport) 4 .............. 6-24 Figure 6-127 Drum 2 Motor Test (RT Transport) 1 .............. 6-25 Figure 6-128 Drum 2 Motor Test (RT Transport) 2 ..............
  • Page 18 UBA Pro RT/RQ™ Series Banknote Recycler List of Figures Page Figure 7-9 RT (Twin) Frame Unit (for RT and RQ) Exploded View 7 ....... 7-14 Figure 7-10 RT (Twin) Frame Unit (for RT and RQ) Exploded View 8 ....... 7-15 Figure 7-11 RQ (Quad) Frame Unit Exploded View 1 ............
  • Page 19 UBA Pro RT/RQ™ Series Banknote Recycler List of Tables Page Table 1-1 RT/RQ Product Model Number Specifications........1-2 Table 1-2 RT/RQ Type Number Specifications..............1-2 Table 1-3 RT/RQ Software Number Specifications............1-2 Table 1-4 RT/RQ Component Names................1-6 Table 1-5 RT/RQ Technical Specifications ................
  • Page 20 UBA Pro RT/RQ™ Series Banknote Recycler List of Tables Page Table 7-27 Recycler Parts List1 ..................7-41 Table 7-28 Recycler Parts List2 ..................7-42 Table 7-29 Recycler Parts List3 ..................7-43 Table 7-30 Recycler Parts List4 ..................7-45 Table 7-31 Recycler Parts List5 ..................
  • Page 21: General Information

    UBA Pro RT/RQ™ Series Banknote Recycler S e c t i o n 1 1 GENERAL INFORMATION This section provides a general overview of the In order to make operation of this device easier and UBA Pro RT/RQ™ Series Banknote Recycler (RT/ make navigation within this manual simpler, the RQ) pictured in Figure 1-1.
  • Page 22: Model Descriptions

    Section 1 UBA Pro RT/RQ™ Series Banknote Recycler General Information Model Descriptions Table 1-2 RT/RQ Type Number Specifications Table 1-1 lists the RT/RQ Product Model Type: * * * - * * - * * * * * * * Number Descriptions.
  • Page 23: User Cautions

    General Information UBA Pro RT/RQ™ Series Banknote Recycler Section 1 Do not install the unit in a dusty  1. Be sure to remove the Power from the RT/RQ (Type 3) environment. Dust may damage the unit or Unit before attaching or unplugging Connector degrade its performance.
  • Page 24: Disposal Considerations

    Section 1 UBA Pro RT/RQ™ Series Banknote Recycler General Information • The RQ Unit is equipped with two high capacity compact Recyclers, each containing two drums for WARNING: Risk of explosion if battery recycling four denominations of Banknotes. is replaced by an incorrect type. •...
  • Page 25: Component Names

    General Information UBA Pro RT/RQ™ Series Banknote Recycler Section 1 Component Names Figure 1-4 illustrates the RT/RQ component names and locations. Figure 1-4 RT/RQ Component Locations Recycler Direction for RT Transport Recycler Direction RT Unit RQ Unit for RQ Transport (flipped) UBA Pro Bottom View Recycler Installation Type...
  • Page 26 Section 1 UBA Pro RT/RQ™ Series Banknote Recycler General Information Table 1-4 RT/RQ Component Names Sym. Description Sym. Description Acceptor Head Unit (UBA Pro) Recycler (RT Transport) Upper Guide Access Lever Recycler (RQ Transport) Bezel Cash Box Acceptor Head Unit Release Lever 1 Transport Unit 1 DIP Switches (Front) 2 Front Transport Unit...
  • Page 27: Specifications

    General Information UBA Pro RT/RQ™ Series Banknote Recycler Section 1 Specifications Technical Specifications Table 1-5 RT/RQ Technical Specifications 98% or greater The following Banknote Types are excluded: • Banknotes with excess or unclear graphics • Acceptance Rate: Double (dual) Banknotes •...
  • Page 28: Environmental Specifications

    Section 1 UBA Pro RT/RQ™ Series Banknote Recycler General Information Table 1-5 RT/RQ Technical Specifications (Continued) RT Unit: Max. 60 Notes (Max. 30 Notes x 2 Drums) ††† Recycler Capacity RQ Unit: Max. 120 Notes (Max. 30 Notes x 4 Drums) USB (USB Specification Rev.
  • Page 33: Bezel Outside Dimensions

    General Information UBA Pro RT/RQ™ Series Banknote Recycler Section 1 Bezel Outside Dimensions Figure 1-9 illustrates the Bezel Outside Dimensions. Figure 1-9 Bezel Outside Dimensions 25.1 25.1 For Stacking Up (SU) Installation For Standard Installation NOTE: All dimensions in millimeters Figure 1-9 Bezel Outside Dimensions P/N 960-000213R_Rev.A ©...
  • Page 34: Technical Contact Information

    Section 1 UBA Pro RT/RQ™ Series Banknote Recycler General Information Technical Contact Information To obtain further technical information regarding the RT/RQ Unit, please contact the nearest location listed below: Americas Asia and Oceania JCM American JCM Gold (HK) Ltd. Phone: +1-702-651-0000 Phone: +852-2429-7187 Fax: +1-702-644-5512 Fax: +852-2929-7003...
  • Page 35: Installation

    UBA Pro RT/RQ™ Series Banknote Recycler S e c t i o n 2 2 INSTALLATION This section provides installation and operating 1. Install the Toothed Washer (Figure 2-1 a), the Grounding Wire (Figure 2-1 b) and then the instructions for the UBA Pro RT/RQ™ Series Screw (Figure 2-1 c) into the Frame Ground (Fig- Banknote Recycler (RT/RQ).
  • Page 36: Bottom Installation (For Standard Installation Type Only)

    Section 2 UBA Pro RT/RQ™ Series Banknote Recycler Installation Bezel Installation Figure 2-2 Side Installation (Standard and SU NOTE: Prepare the following Screw: • M3x16 Screw (provided) • Tightening Torque: 60N·cm 1. Open the UBA Pro’s Cover (Figure 2-4 a). 2.
  • Page 37: Cash Box Lock Installation

    Installation UBA Pro RT/RQ™ Series Banknote Recycler Section 2 Cash Box Lock Installation Unlock Procedure One or two security locks can be installed onto a Make sure lock(s) are installed and rotates in the Cash Box. When installing a security lock, the fol- correct direction(s).
  • Page 38: Dip Switch Configurations

    Section 2 UBA Pro RT/RQ™ Series Banknote Recycler Installation DIP Switch Configurations SW1 and SW2 Configurations The UBA Pro CPU Circuit Board contains two (2) Denomination Acceptance Settings (DIP DIP Switches that are located adjacent to one Switches at the front) another.
  • Page 39: Led Flashing Patterns

    Installation UBA Pro RT/RQ™ Series Banknote Recycler Section 2 LED Flashing Patterns The LED Color Pattern indications listed in Table 2-3 and Table 2-4 occur during various RT/RQ Unit operating and error conditions. NOTE: Refer to “LED Error Codes” on page A-1 for a detailed explanation of each error code. Table 2-3 Recycler and Transport LEDs Flashing Patterns Recycler LED Cause and Solution...
  • Page 40: Connector Pin Assignments

    Section 2 UBA Pro RT/RQ™ Series Banknote Recycler Installation Connector Pin Assignments USB Interface Connector Pin Assignments (UBA Pro Side) Table 2-5 USB Interface Connector Pin Assignments (UBA Pro Side) Socket (UBA Pro Unit Side): DRA-20PC-FO (JAE) Contact (UBA Pro Unit Side): D02-22-26P-10000 (JAE) Socket (Frame Side): DRA-20SC-FO (JAE) Contact (Frame Side): D02-22-26S-10000 (JAE) Contact (Frame Side) Pin No.3, No.13: D02-22-22S-10000 (JAE)
  • Page 41 Installation UBA Pro RT/RQ™ Series Banknote Recycler Section 2 Table 2-6 Photo Coupler Interface Connector Pin Assignments (Continued)(UBA Pro Side) (Continued) Socket (UBA Pro Unit Side): DRA-20PC-FO (JAE) Contact (UBA Pro Unit Side): D02-22-26P-10000 (JAE) Socket (Frame Side): DRA-20SC-FO (JAE) Contact (Frame Side): D02-22-26S-10000 (JAE) Contact (Frame Side) Pin No.3, No.13: D02-22-22S-10000 (JAE) Recommended Wires: Slit Wire UL1061 AWG #26...
  • Page 42: Rs232C Interface Connector Pin Assignments (Uba Pro Side)

    Section 2 UBA Pro RT/RQ™ Series Banknote Recycler Installation RS232C Interface Connector Pin Assignments (UBA Pro Side) NOTE: The Interface setup is required. Refer to “Interface and Recycler Settings (Sub Board 2)” on page 2-4 for the settings. Table 2-7 RS232C Connector Pin Assignments (UBA Pro Side) Socket (UBA Pro Unit Side): DRA-20PC-FO (JAE) Contact (UBA Pro Unit Side): D02-22-26P-10000 (JAE) Socket (Frame Side): DRA-20SC-FO (JAE)
  • Page 43: Cc-Talk Interface Connector Pin Assignments (Uba Pro Side)

    Installation UBA Pro RT/RQ™ Series Banknote Recycler Section 2 cc-Talk Interface Connector Pin Assignments (UBA Pro Side) NOTE: The Interface setup is required. Refer to “Interface and Recycler Settings (Sub Board 2)” on page 2-4 for the settings. Table 2-8 cc-Talk Interface Connector Pin Assignments (UBA Pro Side) Socket (UBA Pro Unit Side): DRA-20PC-FO (JAE) Contact (UBA Pro Unit Side): D02-22-26P-10000 (JAE) Socket (Frame Side): DRA-20SC-FO (JAE)
  • Page 44: Power Supply Connector Pin Assignments (Rt/Rq Side)

    Section 2 UBA Pro RT/RQ™ Series Banknote Recycler Installation Power Supply Connector Pin Assignments (RT/RQ Side) Table 2-9 Power Supply Connector Pin Assignments (RT/RQ Side) Header Type: 43045-0424 (MOLEX) Contact Type: 43030-0001 (MOLEX) Housing: 43025-0400 (MOLEX) Recommended Wires: Slit Wire UL1007 AWG #20-24 Pin No.
  • Page 45: Preventive Maintenance

    Installation UBA Pro RT/RQ™ Series Banknote Recycler Section 2 Preventive Maintenance 2. Remove the Cash Box (Figure 2-13 a). 3. Use the appropriate User-supplied Key(s) to Refilling Banknotes unlock the Cash Box (Figure 2-13 b). Banknotes can be refilled into the Recycler by 4.
  • Page 46: Jammed In Uba Pro Unit

    Section 2 UBA Pro RT/RQ™ Series Banknote Recycler Installation Jammed in UBA Pro Unit 3. Remove any jammed Banknote found there (Fig- ure 2-16 c). To remove jammed Banknotes from the UBA Pro Unit, proceed as follows to clear it. Figure 2-16 RT Transport Banknote Jam Clear 1.
  • Page 47: Jammed In Rq Transport

    Installation UBA Pro RT/RQ™ Series Banknote Recycler Section 2 8. Remove any jammed Banknote found there (Fig- 5. Remove any jammed Banknote found there (Fig- ure 2-19 b). ure 2-22 c). Figure 2-19 RT Transport Banknote Jam Clear Figure 2-22 RQ Transport Banknote Jam Clear Figure 2-19 RT Transport Banknote Jam Clear 5 Jammed in RQ Transport To remove jammed Banknotes from the RQ Trans-...
  • Page 48: Jammed In Recycler Drum

    Section 2 UBA Pro RT/RQ™ Series Banknote Recycler Installation Jammed in Recycler Drum 5. Remove the jammed Banknote (Figure 2-27 b). To remove jammed Banknotes from the Recycler NOTE: Do Not put a tool directly inside Drum, proceed as follows to clear it. of the Recycler to remove a jammed Banknote.
  • Page 49: Cleaning Procedure

    Installation UBA Pro RT/RQ™ Series Banknote Recycler Section 2 Cleaning Procedure Figure 2-29 Sensor and Roller Cleaning To clean the RT/RQ Unit, gently rub the Sensors, Before Rollers or Belts in the Banknote Path using a dry, Cleaning soft, lint-free, Micro-fiber Cloth ONLY. Belt Lens Roller...
  • Page 50: Sensor, Roller And Belt Locations

    Section 2 UBA Pro RT/RQ™ Series Banknote Recycler Installation Sensor, Roller and Belt Locations RT Unit Sensor, Roller and Belt Locations Figure 2-30 RT Unit Sensor, Roller and Belt Locations RT Unit Recycler NOTE: Refer to the UBA Pro Series Universal Banknote Acceptor Operation and Maintenance Manual for the UBA Pro Unit’s sensor locations.
  • Page 51 Installation UBA Pro RT/RQ™ Series Banknote Recycler Section 2 RQ Unit Sensor, Roller and Belt Locations Figure 2-31 RQ Unit Sensor, Roller and Belt Locations RQ Unit Recycler NOTE: Refer to the UBA Pro Series Universal Banknote Acceptor Operation and Maintenance Manual for the UBA Pro Unit’s sensor locations.
  • Page 52 Section 2 UBA Pro RT/RQ™ Series Banknote Recycler Installation Table 2-12 RT/RQ Sensors and Cleaning Methods Sym. Sensors Cleaning Method Note Position Sensor A (RT Transport) Note Position Sensor B (RT Transport) Note Position Sensor C (RT Transport) Wipe clean using a dry, lint free cloth, cotton swab.
  • Page 55: Operational Flowcharts

    Installation UBA Pro RT/RQ™ Series Banknote Recycler Section 2 Operational Flowcharts RT/RQ Main Flow Process Figure 2-34 RT/RQ Main Flow Process Apply Power to the Unit. Power On a) Initializing A) Return from “h” or “d” in this flowchart b) Stand-by c) Inhibit acceptance? d) Status LED is OFF e) Status LED is ON...
  • Page 56: Rt/Rq Accepting Banknotes Flow Process

    Section 2 UBA Pro RT/RQ™ Series Banknote Recycler Installation RT/RQ Accepting Banknotes Flow Process Figure 2-35 RT/RQ Accepting Banknotes Flow Process B1) From “Main” flowchart (Figure 2-34) a) Take the Banknote in b) Centering the Banknote c) Transporting the Banknote d) Sampling the Banknote Data e) Stop Transportation f) Is the Banknote authentic?
  • Page 57: Rt/Rq Transporting To Recycler Flow Process

    Installation UBA Pro RT/RQ™ Series Banknote Recycler Section 2 RT/RQ Transporting to Recycler Flow Process Figure 2-36 RT/RQ Transporting to Recycler Flow Process C1) From “Accepting Banknotes” flowchart  (Figure 2-35) a) Transporting the Banknote to the Recycler b) Was the Banknote transported to the Recycler? c) Retried the transportation operation three (3) times? d) Rotate the Anti-Pullback (PB) Unit e) Was an Abnormal Error detected by the PB Unit?
  • Page 58: Rt/Rq Transporting To Cash Box Flow Process

    Section 2 UBA Pro RT/RQ™ Series Banknote Recycler Installation RT/RQ Transporting to Cash Box Flow Process Figure 2-37 RT/RQ Transporting to Cash Box Flow Process C2) From “Accepting Banknotes” flowchart (Figure 2-35) a) Transporting the Banknote to the Cash Box b) Was the Banknote transported to the Cash Box? c) Retried the transportation operation three (3) times? d) Rotate the Anti-Pullback (PB) Unit...
  • Page 59: Rt/Rq Dispensing Flow Process (Normal)

    Installation UBA Pro RT/RQ™ Series Banknote Recycler Section 2 RT/RQ Dispensing Flow Process (Normal) Figure 2-38 RT/RQ Normal Dispensing Flow Process B2) From “Main” flowchart (Figure 2-34) F) Return from “j” in this flowchart a) Transporting the Banknote b) Sampling the Banknote Data c) Is the Banknote in an abnormal condition? E) To “E”...
  • Page 60: Rt/Rq Dispensing Flow Process (Abnormal)

    Section 2 UBA Pro RT/RQ™ Series Banknote Recycler Installation RT/RQ Dispensing Flow Process (Abnormal) Figure 2-39 RT/RQ Abnormal Dispensing Flow E) From “Dispensing (Normal)” flowchart (Figure 2-38) Process a) Is the Banknote still in the abnormal condition (second time)? (*1) b) Sending an Abnormal Operation Signal c) Was the Banknote transported out of the Recycler? d) Stop transporting the Banknote...
  • Page 61: Rt/Rq Collecting In Cash Box Flow Process 2

    Installation UBA Pro RT/RQ™ Series Banknote Recycler Section 2 RT/RQ Collecting in Cash Box Flow Process 2 Figure 2-41 RT/RQ Collecting in Cash Box Flow Process 2 C3) From “Collecting in Cash Box 2” flowchart (Figure 2-40) a) Transporting the Banknote to the Cash Box b) Was the Banknote transported to the Cash Box? c) Retried the transportation operation three (3) times? d) Stop operation (Abnormal Signal Output (*1)
  • Page 62 Section 2 UBA Pro RT/RQ™ Series Banknote Recycler Installation THIS PAGE INTENTIONALLY LEFT BLANK P/N 960-000213R_Rev.A © 2020, JAPAN CASH MACHINE CO., LTD. 2 - 2 8...
  • Page 63: Communications

    UBA Pro RT/RQ™ Series Banknote Recycler S e c t i o n 3 3 COMMUNICATIONS This section was intentionally left out due to a Non-Disclosure Agreement requirement. If this information is required, please contact the closest office location listed below: Americas Asia and Oceania JCM American...
  • Page 64 Section 3 UBA Pro RT/RQ™ Series Banknote Recycler Communications THIS PAGE INTENTIONALLY LEFT BLANK P/N 960-000213R_Rev.A © 2020, JAPAN CASH MACHINE CO., LTD. 3 - 2...
  • Page 65: Disassembly/Reassembly

    UBA Pro RT/RQ™ Series Banknote Recycler S e c t i o n 4 4 DISASSEMBLY/REASSEMBLY This section provides disassembly and reassembly Figure 4-1 UBA Pro Unit, Recycler and Cash instructions for the UBA Pro RT/RQ™ Series ① Box Removal Banknote Recycler (RT/RQ)....
  • Page 66: Rq Transport Unit Removal

    Section 4 UBA Pro RT/RQ™ Series Banknote Recycler Disassembly/Reassembly RQ Transport Unit Removal RT Frame Unit Removal To remove the Transport Unit in the RQ Transport, To remove the RT Frame Unit, proceed as follows: proceed as follows: 1. Remove the seven (7) Screws (Figure 4-5 1.
  • Page 67: Rq Frame Unit Removal

    Disassembly/Reassembly UBA Pro RT/RQ™ Series Banknote Recycler Section 4 RQ Frame Unit Removal 7. Slide and remove the Frame Rear Cover (Figure 4-7 d) as illustrated by Arrow. To remove the RQ Frame Unit, proceed as follows: Figure 4-7 RT Frame Unit Removal 3 1.
  • Page 68: Flap Board Removal

    Section 4 UBA Pro RT/RQ™ Series Banknote Recycler Disassembly/Reassembly 2. Remove the four (4) Screws (Figure 4-11 4. Remove the two (2) Screws (Figure 4-14 & through 5. Remove the Flap Board (Figure 4-14 c). Figure 4-11 CPU Board Removal 1 Figure 4-14 Flap Board Removal (RT Frame Figure 4-11 CPU Board Removal 1 Figure 4-14 Flap Board Removal (RT Frame Unit) 2...
  • Page 69: Transport Board Removal

    Disassembly/Reassembly UBA Pro RT/RQ™ Series Banknote Recycler Section 4 Key Plate Removal 5. Remove the single (1) Screw (Figure 4-17 b). 6. Remove the Flap Home Board (Figure 4-17 c). To remove the Key Plate, proceed as follows: Figure 4-17 Flap Home Board Removal (RT 1.
  • Page 70: Rear Transport Unit Removal

    Section 4 UBA Pro RT/RQ™ Series Banknote Recycler Disassembly/Reassembly 2. Remove the four (4) Screws (Figure 4-23 5. Remove the Rotary Guide (Figure 4-25 d). through Figure 4-25 Front Transport Unit Removal (RT Figure 4-23 Front Transport Unit Removal (RT Figure 4-23 Front Transport Unit Removal (RT Frame Unit) 2 3.
  • Page 71: Flap Motor Harness Assy. Removal

    Disassembly/Reassembly UBA Pro RT/RQ™ Series Banknote Recycler Section 4 3. Separate the Rear Transport Unit (Figure 4-27 a) 3. Remove the Flap Motor Harness Assy. (Figure 4- as illustrated. 30 a). Figure 4-27 Rear Transport Unit Removal (RT Figure 4-30 Flap Motor Harness Assy. Figure 4-27 Rear Transport Unit Removal Figure 4-30 Flap Motor Harness Assy.
  • Page 72: Tr Worm Wheel (Twin) Removal

    Section 4 UBA Pro RT/RQ™ Series Banknote Recycler Disassembly/Reassembly TR Worm Wheel (Twin) Removal 3. Pick up the Shaft Assy. (Figure 4-33 a) as illus- trated by the Arrow , and then remove it in the ① To remove the TR Worm Wheel (Twin) out of the direction indicated by the Arrow ②...
  • Page 73: Status Led/Collect Button Removal

    Disassembly/Reassembly UBA Pro RT/RQ™ Series Banknote Recycler Section 4 Status LED/Collect Button Removal 3. Remove the two (2) Pulley Shaft Assy. (Figure 4- & To remove the Status LED/Collect Button, proceed as follows: Figure 4-41 Timing Belt Removal (RT Rear 1.
  • Page 74: Back Transport Gear 1 Removal

    Section 4 UBA Pro RT/RQ™ Series Banknote Recycler Disassembly/Reassembly 7. Remove the six (6) Pulleys (Figure 4-44 10. Remove the single (1) Pulley Pin (Figure 4-47 a) and the single (1) the Gear Pulley 2 (Figure 4-47 through Figure 4-44 Timing 11.
  • Page 75: Flap Board Removal

    Disassembly/Reassembly UBA Pro RT/RQ™ Series Banknote Recycler Section 4 Flap Home Board Removal 3. Slightly lift up the Quad Board (Figure 4-50 a) to unplug the four (4) Connectors (Figure 4-50 To remove the Flap Home Board out of the RQ through ) as illustrated by each Arrows.
  • Page 76: Front Transport Unit Removal

    Section 4 UBA Pro RT/RQ™ Series Banknote Recycler Disassembly/Reassembly Front Transport Unit Removal 3. Feed the Harness (Figure 4-58 a) out through the hole (Figure 4-58 b) to remove the Side Frame To remove the Front Transport Unit out of the RQ Assy.
  • Page 77: Rear Transport Unit Removal

    Disassembly/Reassembly UBA Pro RT/RQ™ Series Banknote Recycler Section 4 Rear Transport Unit Removal Flap Motor Harness Assy. Removal To remove the Rear Transport Unit out of the RQ To remove the Flap Motor Harness Assy. out of the Frame Unit, proceed as follows: RQ Frame Unit, proceed as follows: 1.
  • Page 78: Tr Worm Wheel (Twin) Removal

    Section 4 UBA Pro RT/RQ™ Series Banknote Recycler Disassembly/Reassembly TR Worm Wheel (Twin) Removal Figure 4-67 TR Worm Wheel (Twin) Removal To remove the TR Worm Gear (Twin) out of the RQ Frame Unit, proceed as follows: 1. Remove the two (2) Screws (Figure 4-65 &...
  • Page 79: Tr Worm Gear (Twin) Removal

    Disassembly/Reassembly UBA Pro RT/RQ™ Series Banknote Recycler Section 4 TR Worm Gear (Twin) Removal 4. Remove the two (2) Pulley Pins (Figure 4-73 & ) and the two (2) Pulleys (Figure 4-73 & To remove the TR Worm Gear (Twin) out of the RQ Frame Unit, proceed as follows: 1.
  • Page 80: Rt/Rq Frame Unit Disassembly In Common

    Section 4 UBA Pro RT/RQ™ Series Banknote Recycler Disassembly/Reassembly RT/RQ Frame Unit Disassembly In 3. Remove the two (2) Screws (Figure 4-79 & Common 4. Remove the two (2) E-rings (Figure 4-79 & Sponge Roller Assy. Removal (Rear ) and the two (2) Washers (Figure 4-79 &...
  • Page 81: Timing Belt Removal (Transport Unit)

    Disassembly/Reassembly UBA Pro RT/RQ™ Series Banknote Recycler Section 4 Timing Belt Removal (Transport Unit) 10. Remove the three (3) E-rings (Figure 4-82 through ) and the three (3) Shafts (Figure 4-82 To remove the Timing Belts (38-S1.5M-335UVE) through out of the Transport Unit, proceed as follows: 11.
  • Page 82: Recycler Disassembly

    Section 4 UBA Pro RT/RQ™ Series Banknote Recycler Disassembly/Reassembly 7. Remove the two (2) Timing Belts (Figure 4-87 3. Remove the single (1) Screw (Figure 4-90 a) to remove the single (1) Side Cover (Figure 4-90 b). & Figure 4-90 Recycler Figure 4-87 Timing Belt Removal (Transport Figure 4-87 Timing Belt Removal (Transport Unit) 4 Recycler Disassembly...
  • Page 83: Tape Board Removal

    Disassembly/Reassembly UBA Pro RT/RQ™ Series Banknote Recycler Section 4 Tape Board Removal 5. Remove the two (2) Screws (Figure 4-96 & to remove the two Tape Boards (Figure 4-96 & To remove the Tape Board out of the Recycler, pro- ceed as follows: 1.
  • Page 84: Sponge Roller Assy. Removal (Drum 1 Side)

    Section 4 UBA Pro RT/RQ™ Series Banknote Recycler Disassembly/Reassembly Sponge Roller Assy. Removal (Drum 1 4. Remove the single (1) Spring (Figure 4-102 a). Side) 5. Remove the single (1) E-ring (Figure 4-102 b) and the single (1) Drum Guide RO (Figure 4-102 To remove the Sponge Roller Assy.
  • Page 85: Rubber Pulley And Drive Roller Removal (Drum 1 Side)

    Disassembly/Reassembly UBA Pro RT/RQ™ Series Banknote Recycler Section 4 Rubber Pulley and Drive Roller 2. Pull out the two (2) Tapes (Figure 4-108 & Removal (Drum 1 Side) 3. Peel off the Clip Sticker (Figure 4-108 b). To remove the Rubber Pulley and Drive Roller Figure 4-108 Sole- from the Drum 1 Side, proceed as follows: 1.
  • Page 86: Sponge Roller Assy. Removal (Drum 2 Side)

    Section 4 UBA Pro RT/RQ™ Series Banknote Recycler Disassembly/Reassembly 7. Remove the two (2) E-rings (Figure 4-112 & 12. Remove the single (1) Screw (Figure 4-115 a) to remove the Solenoid (Figure 4-115 b). ), the two (2) Clutch Gears (Figure 4-112 &...
  • Page 87: Rubber Pulley And Drive Roller Removal (Drum 2 Side)

    Disassembly/Reassembly UBA Pro RT/RQ™ Series Banknote Recycler Section 4 3. Push the Bottom Course (Figure 4-118 a) in the 3. Remove the two (2) E-rings (Figure 4-121 & direction indicated by the Arrow. ) and the two (2) Bearings (Figure 4-121 &...
  • Page 88 Section 4 UBA Pro RT/RQ™ Series Banknote Recycler Disassembly/Reassembly 2. Remove the two (2) E-rings (Figure 4-124 & 5. Remove the single (1) Harness Cover (Figure 4- 126 a). ), the two (2) Bobbin Gears (Figure 4-124 & 6. Push the Pin (Figure 4-126 b) to remove the ), the two (2) Parallel Pins (Figure 4-124 &...
  • Page 89: Clear Film And Det Film Removal

    Disassembly/Reassembly UBA Pro RT/RQ™ Series Banknote Recycler Section 4 Clear Film and DET Film Removal To remove the Clear Film and the DET Film, pro- ceed as follows: 1. Push the Film Bobbin Assy. (Figure 4-128 a) in the direction indicated by the Arrow to remove the single (1) Parallel Pin (Figure 4-128 b).
  • Page 90 Section 4 UBA Pro RT/RQ™ Series Banknote Recycler Disassembly/Reassembly THIS PAGE INTENTIONALLY LEFT BLANK P/N 960-000213R_Rev.A © 2020, JAPAN CASH MACHINE CO., LTD. 4 - 2 6...
  • Page 91: Wiring Diagrams

    UBA Pro RT/RQ™ Series Banknote Recycler S e c t i o n 5 5 WIRING DIAGRAMS This section provides a Wiring Diagram for the This section contains the following information: UBA Pro RT/RQ™ Series Banknote Recycler (RT/ • RT/RQ Wiring Diagram RQ).
  • Page 92 Section 5 UBA Pro RT/RQ™ Series Banknote Recycler Wiring Diagrams THIS PAGE INTENTIONALLY LEFT BLANK P/N 960-000213R_Rev.A © 2020, JAPAN CASH MACHINE CO., LTD. 5 - 2...
  • Page 93: Calibration And Testing

    UBA Pro RT/RQ™ Series Banknote Recycler S e c t i o n 6 6 CALIBRATION AND TESTING Installation Procedures This section provides Calibration and Performance Testing instructions for the UBA Pro RT/RQ™ Perform the following steps to install the “ JCM Tool Series Banknote Recycler (RT/RQ)....
  • Page 94: Part 2 - Usb Drivers Installation

    Section 6 UBA Pro RT/RQ™ Series Banknote Recycler Calibration and Testing Part 2 - USB Drivers Installation 5. Click the “ Next> ” Screen Button (Figure 6-4 a) when the “ ” Screen Destination Folder USB Drivers need to be installed on the PC before shown in Figure 6-4 appears.
  • Page 95: Jcm Tool Suite Standard Edition Modes

    Calibration and Testing UBA Pro RT/RQ™ Series Banknote Recycler Section 6 JCM Tool Suite Standard Edition To download the Software Program, proceed as follows: Modes 1. Remove electrical power. The following two (2) mode feature types exist in 2. Set the RT/RQ’s DIP Switches to All OFF the “...
  • Page 96 Section 6 UBA Pro RT/RQ™ Series Banknote Recycler Calibration and Testing When downloading the Software Program for the 14. When the “ ” Screen re- JCM Downloader Suite first time, the Device Information will not appear appears, click the “ ”...
  • Page 97: Calibration

    Calibration and Testing UBA Pro RT/RQ™ Series Banknote Recycler Section 6 Calibration 8. Select “ ” (Figure 6-22 a). Sensor Adjustment This section provides instructions for performing a Figure 6-22 Sensor Calibration 2 calibration of the Recycler Sensors. NOTE: Refer to the UBA Pro Series Universal Banknote Acceptor Operation and Maintenance Manual for calibrating the Sensors on the UBA Pro Unit.
  • Page 98: Performance Test Using A Pc

    Section 6 UBA Pro RT/RQ™ Series Banknote Recycler Calibration and Testing List of the Performance Tests without a 12. The 2 Sensor Calibration items will automati- cally run. List of the UBA Pro Unit Performance Tests Figure 6-25 Sensor Calibration 5 = Done = In-operation = Error...
  • Page 99: Launch Performance Test Program

    Calibration and Testing UBA Pro RT/RQ™ Series Banknote Recycler Section 6 Launch Performance Test Program Status LED Test To launch the Performance Test program, proceed To perform the Status LED Test, proceed as fol- as follows: lows: 1. Remove electrical power. 1.
  • Page 100: Dip Switch Test

    Section 6 UBA Pro RT/RQ™ Series Banknote Recycler Calibration and Testing DIP Switch Test RT Transport Performance Tests To perform the DIP Switch Test, proceed as fol- This section provides instructions for conducting a lows: Performance Test Using a PC on the RT Transport side ( Figure 6-27 1.
  • Page 101: Feed Motor Speed Reverse Rotation Test (Rt Transport)

    Calibration and Testing UBA Pro RT/RQ™ Series Banknote Recycler Section 6 Flapper Motor Operation Time Test (RT  Feed Motor Speed Reverse Rotation Test (RT Transport) Transport) To perform the Feed Motor Speed Test in the To perform the Flapper Motor Operation Time Test reverse rotation on the RT Transport side, proceed on the RT Transport side, proceed as follows: as follows:...
  • Page 102: Note Position Sensor 1-3 Test

    Section 6 UBA Pro RT/RQ™ Series Banknote Recycler Calibration and Testing Note Position Sensor 1-3 Test Note Position Sensor A-C Test To perform the Note Position Sensor 1 through 3 To perform the Note Position Sensor A through C Test on the RT Transport side, proceed as follows: Test on the RT Transport side, proceed as follows: 1.
  • Page 103: Solenoid Test (Rt Transport)

    Calibration and Testing UBA Pro RT/RQ™ Series Banknote Recycler Section 6 Solenoid Test (RT Transport) Drum 1 Motor Speed Test (RT Transport) To perform the Recycler’s Solenoid Test on the RT To perform the Drum 1 Motor Speed Test on the Transport side, proceed as follows: RT Transport side, proceed as follows: 1.
  • Page 104: Drum 2 Motor Speed Test (Rt Transport)

    Section 6 UBA Pro RT/RQ™ Series Banknote Recycler Calibration and Testing RQ Transport Performance Tests Drum 2 Motor Speed Test (RT Transport) To perform the Drum 2 Motor Speed Test on the This section provides instructions for conducting a RT Transport side, proceed as follows: Performance Test Using a PC on the RQ Transport side ( Figure 6-27...
  • Page 105: Feed Motor Speed Reverse Rotation Test (Rq Transport)

    Calibration and Testing UBA Pro RT/RQ™ Series Banknote Recycler Section 6 Feed Motor Speed Reverse Rotation Test (RQ Flapper Motor Operation Time Test (RQ Transport) Transport) To perform the Feed Motor Speed Test in the To perform the Flapper Motor Operation Time Test reserve rotation on the RQ Transport side, proceed on the RQ Transport side, proceed as follows: as follows:...
  • Page 106: Note Position Sensor 4-6 Test

    Section 6 UBA Pro RT/RQ™ Series Banknote Recycler Calibration and Testing Note Position Sensor 4-6 Test Note Position Sensor D-F Test To perform the Note Position Sensor 4 through 6 To perform the Note Position Sensor D through F Test on the RQ Transport side, proceed as follows: Test on the RQ Transport side with a PC, proceed as follows: 1.
  • Page 107: Solenoid Test (Rq Transport)

    Calibration and Testing UBA Pro RT/RQ™ Series Banknote Recycler Section 6 Solenoid Test (RQ Transport) Drum 1 Motor Speed Test (RQ Transport) To perform the Recycler’s Solenoid Test on the RQ To perform the Drum 1 Motor Speed Test on the Transport side, proceed as follows: RQ Transport side, proceed as follows: 1.
  • Page 108: Drum 2 Motor Speed Test

    Section 6 UBA Pro RT/RQ™ Series Banknote Recycler Calibration and Testing Drum 2 Motor Speed Test To perform the Drum 2 Motor Speed Test on the RQ Transport side, proceed as follows: 1. Ensure that the Recycler and Cash Box is prop- erly installed.
  • Page 109: Performance Test Without A Pc

    Calibration and Testing UBA Pro RT/RQ™ Series Banknote Recycler Section 6 Performance Test without a PC Figure 6-71 DIP Switches and RT/RQ RT/RQ’s DIP Switches UBA Pro’s DIP Switches The various Performance Tests for the RT Transport (Figure 6-71 a) and the RQ Transport (Figure 6-71 b) can be conducted with a combination of the DIP Switch settings of the UBA Pro Unit and RT/RQ Unit.
  • Page 110: Communication Test

    Section 6 UBA Pro RT/RQ™ Series Banknote Recycler Calibration and Testing Communication Test Status LED Test To test the communication between UBA Pro and To test the RT/RQ Unit Status LED’s performance, RT/RQ Unit, proceed as follows: proceed as follows: 1.
  • Page 111: Dip Switch Test

    Calibration and Testing UBA Pro RT/RQ™ Series Banknote Recycler Section 6 DIP Switch Test 8. The UBA Pro Green Status LED will turn on when the RT/RQ DIP Switches function properly. To test the RT/RQ Unit DIP Switch’s performance, proceed as follows: Figure 6-85 DIP Green 1.
  • Page 112: Rt Transport Performance Tests

    Section 6 UBA Pro RT/RQ™ Series Banknote Recycler Calibration and Testing RT Transport Performance Tests 6. Remove the Recycler from the RT Transport. This section provides instructions for conducting a Figure 6-93 Feed Motor Performance Test Without a PC on the RT  Transport side (Figure 6-71 a).
  • Page 113: Feed Motor Reverse Rotation Test (Rt Transport)

    Calibration and Testing UBA Pro RT/RQ™ Series Banknote Recycler Section 6 Feed Motor Reverse Rotation Test  7. To start the Test, set the UBA Pro DIP Switch #8 (Figure 6-100). (RT Transport) To run the Feed Motor Reverse Rotation Test on Figure 6-100 Feed the RT Transport side, proceed as follows: DIP Switch #8 OFF...
  • Page 114: Note Position Sensor 1 - 3 Test

    Section 6 UBA Pro RT/RQ™ Series Banknote Recycler Calibration and Testing 4. Apply electrical power. Note Position Sensor 1 - 3 Test 5. Confirm that the Status LED/Collect Button is lit To run the Note Position Sensor 1 - 3 Test on the Green Color and then turns off.
  • Page 115: Note Position Sensor A - C Test (Rt Transport)

    Calibration and Testing UBA Pro RT/RQ™ Series Banknote Recycler Section 6 7. Remove the Recycler from the RT Transport. 3. Set the DIP Switches of the RT/RQ Unit as below (Figure 6-115). 8. Lift the Front Transport to block Note Position Sensor 1 and 2.
  • Page 116: Recycler Solenoid Test (Rt Transport)

    Section 6 UBA Pro RT/RQ™ Series Banknote Recycler Calibration and Testing Recycler Solenoid Test (RT Transport) Drum 1 Motor Test (RT Transport) To run the Recycler Solenoid on the RT Transport To run the Recycler Solenoid on the RT Transport side, proceed as follows: side, proceed as follows: 1.
  • Page 117: Drum 2 Motor Test (Rt Transport)

    Calibration and Testing UBA Pro RT/RQ™ Series Banknote Recycler Section 6 RQ Transport Performance Tests Drum 2 Motor Test (RT Transport) To run the Recycler Solenoid on the RT Transport This section provides instructions for conducting a side, proceed as follows: Performance Test Without a PC on the RQ Trans- port side (Figure 6-71 b).
  • Page 118: Feed Motor Reverse Rotation Test (Rq Transport)

    Section 6 UBA Pro RT/RQ™ Series Banknote Recycler Calibration and Testing 6. Remove the Recycler from the RQ Transport. 3. Set the DIP Switches of the RQ Unit as below (Figure 6-137). Figure 6-134 Feed Motor Figure 6-137 Feed DIP Switches #2, #8 ON Figure 6-137 Feed Motor Reverse Rotation Test (RQ Transport) 2 4.
  • Page 119: Flapper Motor Test (Rq Transport)

    Calibration and Testing UBA Pro RT/RQ™ Series Banknote Recycler Section 6 Flapper Motor Test (RQ Transport) Figure 6-145 Flapper To run the Flapper Motor Test on the RQ Transport DIP Switch #8 OFF side, proceed as follows: 1. Remove electrical power. 2.
  • Page 120: Note Position Sensor D - F Test (Rq Transport)

    Section 6 UBA Pro RT/RQ™ Series Banknote Recycler Calibration and Testing Note Position Sensor D - F Test  4. Apply electrical power. (RQ Transport) 5. Confirm that the Status LED/Collect Button is lit Green Color and then turns off. To run the Note Position Sensor D - F Test on the NOTE: Wait for the Status LED to turn off RQ Transport side, proceed as follows:...
  • Page 121: Recycler Solenoid Test (Rq Transport)

    Calibration and Testing UBA Pro RT/RQ™ Series Banknote Recycler Section 6 7. Remove the Recycler from the RQ Transport to Figure 6-159 Recycle Sole- block the Note Position Sensor D through F. Figure 6-156 Note Position Green Figure 6-159 Recycle Solenoid Test (RQ Transport) 3 6.
  • Page 122: Drum 2 Motor Test (Rq Transport)

    Section 6 UBA Pro RT/RQ™ Series Banknote Recycler Calibration and Testing 4. Apply electrical power. 4. Apply electrical power. 5. Confirm that the Status LED/Collect Button is lit 5. Confirm that the Status LED/Collect Button is lit Green Color and then turns off. Green Color and then turns off.
  • Page 123: Exploded Views & Parts Lists

    UBA Pro RT/RQ™ Series Banknote Recycler S e c t i o n 7 7 EXPLODED VIEWS & PARTS LISTS • This section provides product exploded views and RT (Twin) Frame Unit (for RT and RQ) parts lists for the UBA Pro RT/RQ™ Series •...
  • Page 124: Rt Entire Unit Parts List

    Section 7 UBA Pro RT/RQ™ Series Banknote Recycler Exploded Views & Parts Lists RT Entire Unit Parts List Table 7-1 RT Entire Unit Parts List EDP No. Description Remark 274705 RT (RC-Twin) Rear Cover 091531 M2.6×6_P4 Pan Head W Washer 148186 2.6X6 Flat Head P-TITE, Black, Iron/Chromium (III) 281971...
  • Page 125: Rq Entire Unit Exploded View

    Exploded Views & Parts Lists UBA Pro RT/RQ™ Series Banknote Recycler Section 7 RQ Entire Unit Exploded View Figure 7-2 SH2 Box (400 Notes) Frame Figure 7-2 RQ Entire Unit Exploded View P/N 960-000213R_Rev.A © 2020, JAPAN CASH MACHINE CO., LTD. 7 - 3...
  • Page 126: Rq Entire Unit Parts List

    Section 7 UBA Pro RT/RQ™ Series Banknote Recycler Exploded Views & Parts Lists RQ Entire Unit Parts List Table 7-2 RQ Entire Unit Parts List EDP No. Description Remark 274705 RT (RC-Twin) Rear Cover 274767 Frame-Rear-Cover-Q_PT 091531 M2.6×6_P4 Pan Head W Washer 2.6×8 Binding Head P-TITE Screw (Phillips, Self- 056165 Tapping), Iron/Chromium(III)
  • Page 127: Rt (Twin) Frame Unit (For Rt And Rq) Exploded View 1

    Exploded Views & Parts Lists UBA Pro RT/RQ™ Series Banknote Recycler Section 7 RT (Twin) Frame Unit (for RT and RQ) Exploded View 1 Figure 7-3 RT (Twin) Frame Unit (for RT and Figure 7-3 RT (Twin) Frame Unit (for RT and RQ) Exploded View 1 RT (Twin) Frame Unit (for RT and RQ) Parts List 1 Table 7-3 RT (Twin) Frame Unit (for RT and RQ) Parts List 1 No.
  • Page 128: Rt (Twin) Frame Unit (For Rt And Rq) Exploded View 2

    Section 7 UBA Pro RT/RQ™ Series Banknote Recycler Exploded Views & Parts Lists RT (Twin) Frame Unit (for RT and RQ) Exploded View 2 Figure 7-4 RT (Twin) Frame Unit (for RT and Figure 7-4 RT (Twin) Frame Unit (for RT and RQ) Exploded View 2 P/N 960-000213R_Rev.A ©...
  • Page 129: Rt (Twin) Frame Unit (For Rt And Rq) Parts List 2

    Exploded Views & Parts Lists UBA Pro RT/RQ™ Series Banknote Recycler Section 7 RT (Twin) Frame Unit (for RT and RQ) Parts List 2 Table 7-4 RT (Twin) Frame Unit (for RT and RQ) Parts List 2 No. EDP No. Description Remark 265780...
  • Page 130: Rt (Twin) Frame Unit (For Rt And Rq) Exploded View 3

    Section 7 UBA Pro RT/RQ™ Series Banknote Recycler Exploded Views & Parts Lists RT (Twin) Frame Unit (for RT and RQ) Exploded View 3 Figure 7-5 RT (Twin) Frame Unit (for RT and Figure 7-5 RT (Twin) Frame Unit (for RT and RQ) Exploded View 3 P/N 960-000213R_Rev.A ©...
  • Page 131: Rt (Twin) Frame Unit (For Rt And Rq) Parts List 3

    Exploded Views & Parts Lists UBA Pro RT/RQ™ Series Banknote Recycler Section 7 RT (Twin) Frame Unit (for RT and RQ) Parts List 3 Table 7-5 RT (Twin) Frame Unit (for RT and RQ) Parts List 3 EDP No. Description Remark 274716 Rotary-G Gear Cover...
  • Page 132: Rt (Twin) Frame Unit (For Rt And Rq) Exploded View 4

    Section 7 UBA Pro RT/RQ™ Series Banknote Recycler Exploded Views & Parts Lists RT (Twin) Frame Unit (for RT and RQ) Exploded View 4 Figure 7-6 RT (Twin) Frame Unit (for RT and Figure 7-6 RT (Twin) Frame Unit (for RT and RQ) Exploded View 4 RT (Twin) Frame Unit (for RT and RQ) Parts List 4 Table 7-6 RT (Twin) Frame Unit (for RT and RQ) Parts List 4 EDP No.
  • Page 133: Rt (Twin) Frame Unit (For Rt And Rq) Exploded View 5

    Exploded Views & Parts Lists UBA Pro RT/RQ™ Series Banknote Recycler Section 7 RT (Twin) Frame Unit (for RT and RQ) Exploded View 5 Figure 7-7 RT (Twin) Frame Unit (for RT and Figure 7-7 RT (Twin) Frame Unit (for RT and RQ) Exploded View 5 RT (Twin) Frame Unit (for RT and RQ) Parts List 5 Table 7-7 RT (Twin) Frame Unit (for RT and RQ) Parts List 5 EDP No.
  • Page 134: Rt (Twin) Frame Unit (For Rt And Rq) Exploded View 6

    Section 7 UBA Pro RT/RQ™ Series Banknote Recycler Exploded Views & Parts Lists RT (Twin) Frame Unit (for RT and RQ) Exploded View 6 Figure 7-8 RT (Twin) Frame Unit (for RT and Figure 7-8 RT (Twin) Frame Unit (for RT and RQ) Exploded View 6 P/N 960-000213R_Rev.A ©...
  • Page 135: Rt (Twin) Frame Unit (For Rt And Rq) Parts List 6

    Exploded Views & Parts Lists UBA Pro RT/RQ™ Series Banknote Recycler Section 7 RT (Twin) Frame Unit (for RT and RQ) Parts List 6 Table 7-8 RT (Twin) Frame Unit (for RT and RQ) Parts List 6 EDP No. Description Remark 274725 F-LED Cover...
  • Page 136: Rt (Twin) Frame Unit (For Rt And Rq) Exploded View 7

    Section 7 UBA Pro RT/RQ™ Series Banknote Recycler Exploded Views & Parts Lists RT (Twin) Frame Unit (for RT and RQ) Exploded View 7 Figure 7-9 RT (Twin) Frame Unit (for RT and Figure 7-9 RT (Twin) Frame Unit (for RT and RQ) Exploded View 7 RT (Twin) Frame Unit (for RT and RQ) Parts List 7 Table 7-9 RT (Twin) Frame Unit (for RT and RQ) Parts List 7 EDP No.
  • Page 137: Rt (Twin) Frame Unit (For Rt And Rq) Exploded View 8

    Exploded Views & Parts Lists UBA Pro RT/RQ™ Series Banknote Recycler Section 7 RT (Twin) Frame Unit (for RT and RQ) Exploded View 8 Figure 7-10 RT (Twin) Frame Unit (for RT and Figure 7-10 RT (Twin) Frame Unit (for RT and RQ) Exploded View 8 RT (Twin) Frame Unit (for RT and RQ) Parts List 8 Table 7-10 RT (Twin) Frame Unit (for RT and RQ) Parts List 8 EDP No.
  • Page 138: Rq (Quad) Frame Unit Exploded View 1

    Section 7 UBA Pro RT/RQ™ Series Banknote Recycler Exploded Views & Parts Lists RQ (Quad) Frame Unit Exploded View 1 Figure 7-11 RQ (Quad) Frame Unit Exploded 1001 1003 1004 1002 1005 1005 1003 1004 Figure 7-11 RQ (Quad) Frame Unit Exploded View 1 RQ (Quad) Frame Unit Parts List 1 Table 7-11 RQ (Quad) Frame Unit Parts List 1 EDP No.
  • Page 139: Figure 7-12 Rq (Quad) Frame Unit Exploded View 2

    Exploded Views & Parts Lists UBA Pro RT/RQ™ Series Banknote Recycler Section 7 RQ (Quad) Frame Unit Exploded View 2 Figure 7-12 RQ (Quad) Frame Unit Exploded 1101 1104 1115 1103 1102 1113 1107 1106 1108 1105 1113 1109 1103 1114 1110 1111...
  • Page 140: Rq (Quad) Frame Unit Parts List 2

    Section 7 UBA Pro RT/RQ™ Series Banknote Recycler Exploded Views & Parts Lists RQ (Quad) Frame Unit Parts List 2 Table 7-12 RQ (Quad) Frame Unit Parts List 2 EDP No. Description Remark 1101 274550 Bearing (Anti-Environment Stress Cracking) 1102 280428 E-Slit Crown 2.6×8 Binding Head P-TITE Screw (Phillips, Self-Tapping), Iron/...
  • Page 141: Rq (Quad) Frame Unit Exploded View 3

    Exploded Views & Parts Lists UBA Pro RT/RQ™ Series Banknote Recycler Section 7 RQ (Quad) Frame Unit Exploded View 3 Figure 7-13 RQ (Quad) Frame Unit Exploded 1209 1201 1207 1202 1203 1206 1204 1208 1205 1206 1206 Figure 7-13 RQ (Quad) Frame Unit Exploded View 3 RQ (Quad) Frame Unit Parts List 3 Table 7-13 RQ (Quad) Frame Unit Parts List 3 EDP No.
  • Page 142: Figure 7-14 Rq (Quad) Frame Unit Exploded View 4

    Section 7 UBA Pro RT/RQ™ Series Banknote Recycler Exploded Views & Parts Lists RQ (Quad) Frame Unit Exploded View 4 Figure 7-14 RQ (Quad) Frame Unit Exploded 1301 1303 1302 1314 1304 1311 1306 1305 1302 1311 1307 1311 1316 1317 1308 1311...
  • Page 143: Rq (Quad) Frame Unit Parts List 4

    Exploded Views & Parts Lists UBA Pro RT/RQ™ Series Banknote Recycler Section 7 RQ (Quad) Frame Unit Parts List 4 Table 7-14 RQ (Quad) Frame Unit Parts List 4 EDP No. Description Remark 1301 275444 Flapper Motor Harness Assy. (4115-3640-03-001) 1302 274552 Bearing (Anti-Environment Stress Cracking)
  • Page 144: Rq (Quad) Frame Unit Exploded View 5

    Section 7 UBA Pro RT/RQ™ Series Banknote Recycler Exploded Views & Parts Lists RQ (Quad) Frame Unit Exploded View 5 Figure 7-15 RQ (Quad) Frame Unit Exploded 1405 1407 1401 1402 1407 1401 1407 1406 1402 1403 1403 1405 1407 1404 Figure 7-15 RQ (Quad) Frame Unit Exploded View 5 RQ (Quad) Frame Unit Parts List 5...
  • Page 145: Front Transport Unit Exploded View 1

    Exploded Views & Parts Lists UBA Pro RT/RQ™ Series Banknote Recycler Section 7 Front Transport Unit Exploded View 1 Figure 7-16 Front Transport Unit Exploded 1505 1510 1501 1508 1507 1502 1503 1507 1508 1506 1509 1504 1509 1506 1504 Figure 7-16 Front Transport Unit Exploded View 1 Front Transport Unit Parts List 1 Table 7-16 Front Transport Unit Parts List 1...
  • Page 146: Figure 7-17 Front Transport Unit Exploded View 2

    Section 7 UBA Pro RT/RQ™ Series Banknote Recycler Exploded Views & Parts Lists Front Transport Unit Exploded View 2 Figure 7-17 Front Transport Unit Exploded 1603 1603 1604 1605 1607 1601 1601 1602 1602 1603 1603 1606 1606 1602 1602 1606 1606 1603...
  • Page 147: Transport Unit Exploded View 1

    Exploded Views & Parts Lists UBA Pro RT/RQ™ Series Banknote Recycler Section 7 Transport Unit Exploded View 1 Figure 7-18 Transport Unit Exploded View 1 1707 1708 1708 1701 1702 1711 1709 1705 1703 1710 1704 1711 1710 1711 1711 1706 1709 Figure 7-18 Transport Unit Exploded View 1...
  • Page 148: Figure 7-19 Transport Unit Exploded View 2

    Section 7 UBA Pro RT/RQ™ Series Banknote Recycler Exploded Views & Parts Lists Transport Unit Exploded View 2 Figure 7-19 Transport Unit Exploded View 2 1801 1802 1803 1814 1802 1804 1805 1802 1801 1814 1802 1806 1807 1808 1807 1811 1810 1813...
  • Page 149: Transport Unit Parts List 2

    Exploded Views & Parts Lists UBA Pro RT/RQ™ Series Banknote Recycler Section 7 Transport Unit Parts List 2 Table 7-19 Transport Unit Parts List 2 EDP No. Description Remark 1801 274543 Timing Belt (38-S1.5M-335UVE) 1802 091168 PULLEY D*R 1803 274684 Guide-L PU-Beam A 1804 274752...
  • Page 150: Figure 7-20 Transport Unit Exploded View 3

    Section 7 UBA Pro RT/RQ™ Series Banknote Recycler Exploded Views & Parts Lists Transport Unit Exploded View 3 Figure 7-20 Transport Unit Exploded View 3 1906 1906 1904 1904 1906 1906 1905 1905 1901 1901 1904 1904 1901 1902 1903 1906 1903 1906...
  • Page 151: Rear Transport Unit For Rt Frame Unit Exploded View 1

    Exploded Views & Parts Lists UBA Pro RT/RQ™ Series Banknote Recycler Section 7 Rear Transport Unit for RT Frame Unit Exploded View 1 Figure 7-21 Rear Transport Unit for RT Frame 2007 2007 2001 2002 2002 2008 2008 2003 2003 2006 2004 2004...
  • Page 152: Rear Transport Unit For Rt Frame Unit Exploded View 2

    Section 7 UBA Pro RT/RQ™ Series Banknote Recycler Exploded Views & Parts Lists Rear Transport Unit for RT Frame Unit Exploded View 2 Figure 7-22 Rear Transport Unit for RT Frame 2101 2102 2113 2111 2102 2114 2101 2113 2112 2103 2104 2105...
  • Page 153: Rear Transport Unit For Rt Frame Unit Parts List 2

    Exploded Views & Parts Lists UBA Pro RT/RQ™ Series Banknote Recycler Section 7 Rear Transport Unit for RT Frame Unit Parts List 2 Table 7-22 Rear Transport Unit for RT Frame Unit Parts List 2 EDP No. Description Remark 2101 274738 Idler Pulley Shaft 2102...
  • Page 154: Rear Transport Unit For Rt Frame Unit Exploded View 3

    Section 7 UBA Pro RT/RQ™ Series Banknote Recycler Exploded Views & Parts Lists Rear Transport Unit for RT Frame Unit Exploded View 3 Figure 7-23 Rear Transport Unit for RT Frame 2201 2204 2202 2203 2201 2202 2213 2212 2213 2205 2206 2206...
  • Page 155: Rear Transport Unit For Rt Frame Unit Parts List 3

    Exploded Views & Parts Lists UBA Pro RT/RQ™ Series Banknote Recycler Section 7 Rear Transport Unit for RT Frame Unit Parts List 3 Table 7-23 Rear Transport Unit for RT Frame Unit Parts List 3 EDP No. Description Remark 2201 274735 Roller BLT 2202...
  • Page 156: Rear Transport Unit For Rq Frame Unit Exploded View 1

    Section 7 UBA Pro RT/RQ™ Series Banknote Recycler Exploded Views & Parts Lists Rear Transport Unit for RQ Frame Unit Exploded View 1 Figure 7-24 Rear Transport Unit for RQ Frame 2312 2308 2306 2313 2308 2313 2306 2307 2307 2307 2307 2303...
  • Page 157: Rear Transport Unit For Rq Frame Unit Parts List 1

    Exploded Views & Parts Lists UBA Pro RT/RQ™ Series Banknote Recycler Section 7 Rear Transport Unit for RQ Frame Unit Parts List 1 Table 7-24 Rear Transport Unit for RQ Frame Unit Parts List 1 EDP No. Description Remark 2301 269212 Bearing (Anti-Environment Stress Cracking) 2302...
  • Page 158: Rear Transport Unit For Rq Frame Unit Exploded View 2

    Section 7 UBA Pro RT/RQ™ Series Banknote Recycler Exploded Views & Parts Lists Rear Transport Unit for RQ Frame Unit Exploded View 2 Figure 7-25 Rear Transport Unit for RQ Frame 2401 2420 2402 2403 2406 2405 2405 2404 2423 2421 2423 2410...
  • Page 159: Rear Transport Unit For Rq Frame Unit Parts List 2

    Exploded Views & Parts Lists UBA Pro RT/RQ™ Series Banknote Recycler Section 7 Rear Transport Unit for RQ Frame Unit Parts List 2 Table 7-25 Rear Transport Unit for RQ Frame Unit Parts List 2 EDP No. Description Remark 2401 234695 TR MOTOR PINION GEAR 2402...
  • Page 160: Rear Transport Unit For Rq Frame Unit Exploded View 3

    Section 7 UBA Pro RT/RQ™ Series Banknote Recycler Exploded Views & Parts Lists Rear Transport Unit for RQ Frame Unit Exploded View 3 Figure 7-26 Rear Transport Unit for RQ Frame 2511 2501 2512 2502 2502 2503 2504 2505 2508 2506 2507 2509...
  • Page 161: Rear Transport Unit For Rq Frame Unit Parts List 3

    Exploded Views & Parts Lists UBA Pro RT/RQ™ Series Banknote Recycler Section 7 Rear Transport Unit for RQ Frame Unit Parts List 3 Table 7-26 Rear Transport Unit for RQ Frame Unit Parts List 3 EDP No. Description Remark 2501 274714 Light Guide Cover 2502...
  • Page 162: Figure 7-27 Recycler Exploded View 1

    Section 7 UBA Pro RT/RQ™ Series Banknote Recycler Exploded Views & Parts Lists Recycler Exploded View 1 Figure 7-27 Recycler Exploded View 1 2605 2602 2605 2605 2605 2601 2605 2608 2609 2603 2610 2606 2607 2612 2611 2604 2606 Figure 7-27 Recycler Exploded View 1 P/N 960-000213R_Rev.A ©...
  • Page 163: Table 7-27 Recycler Parts List1

    Exploded Views & Parts Lists UBA Pro RT/RQ™ Series Banknote Recycler Section 7 Recycler Parts List 1 Table 7-27 Recycler Parts List1 EDP No. Description Remark 2601 274809 WU (Recycler) Front Cover 2602 274813 WU (Recycler) Side Cover 2603 274811 WU (Recycler) Rear Cover2 2604 274822...
  • Page 164: Figure 7-28 Recycler Exploded View 2

    Section 7 UBA Pro RT/RQ™ Series Banknote Recycler Exploded Views & Parts Lists Recycler Exploded View 2 Figure 7-28 Recycler Exploded View 2 2705 2705 2701 2706 2702 2703 2702 2705 2703 2704 2705 2709 2704 2708 2707 2709 2707 Figure 7-28 Recycler Exploded View 2 Recycler Parts List 2 Table 7-28 Recycler Parts List2...
  • Page 165: Table 7-29 Recycler Parts List3

    Exploded Views & Parts Lists UBA Pro RT/RQ™ Series Banknote Recycler Section 7 Recycler Exploded View 3 Figure 7-29 Recycler Exploded View 3 2801 2803 2803 Drum 1 Side 2803 2804 Drum 2 Side 2804 2802 Figure 7-29 Recycler Exploded View 3 Recycler Parts List 3 Table 7-29 Recycler Parts List3 EDP No.
  • Page 166: Figure 7-30 Recycler Exploded View 4

    Section 7 UBA Pro RT/RQ™ Series Banknote Recycler Exploded Views & Parts Lists Recycler Exploded View 4 Figure 7-30 Recycler Exploded View 4 Drum 1 Side 2926 2913 2914 2913 2926 2928 2915 2901 2926 2923 2923 2916 2926 2928 2926 2924 2923...
  • Page 167: Table 7-30 Recycler Parts List4

    Exploded Views & Parts Lists UBA Pro RT/RQ™ Series Banknote Recycler Section 7 Recycler Parts List 4 Table 7-30 Recycler Parts List4 EDP No. Description Remark 2901 216077 DRUM GUIDE RO 2902 274823 WU (Recycler) Flap Lever 2903 274795 WU (Recycler) Flap KS 2904 274840 SOL Link Stud...
  • Page 168: Figure 7-31 Recycler Exploded View 5

    Section 7 UBA Pro RT/RQ™ Series Banknote Recycler Exploded Views & Parts Lists Recycler Exploded View 5 Figure 7-31 Recycler Exploded View 5 Drum 1 Side 3013 3001 3001 3014 3014 3002 3003 3004 3003 3003 3003 3006 3015 3005 3007 3003 3012...
  • Page 169: Table 7-31 Recycler Parts List5

    Exploded Views & Parts Lists UBA Pro RT/RQ™ Series Banknote Recycler Section 7 Recycler Parts List 5 Table 7-31 Recycler Parts List5 EDP No. Description Remark 3001 216063 FILM SET CLIP 3002 274833 WU (Recycler) Pay-Out SH 3003 144584 BEARING 3004 144591 CLUTCH GEAR...
  • Page 170: Figure 7-32 Recycler Exploded View 6

    Section 7 UBA Pro RT/RQ™ Series Banknote Recycler Exploded Views & Parts Lists Recycler Exploded View 6 Figure 7-32 Recycler Exploded View 6 Figure 7-32 Recycler Exploded View 6 P/N 960-000213R_Rev.A © 2020, JAPAN CASH MACHINE CO., LTD. 7 - 4 8...
  • Page 171: Table 7-32 Recycler Parts List6

    Exploded Views & Parts Lists UBA Pro RT/RQ™ Series Banknote Recycler Section 7 Recycler Parts List 6 Table 7-32 Recycler Parts List6 EDP No. Description Remark 3101 274838 Recycler (WU) Guide Roller Shaft 3102 216066 GUIDE ROLLER 3103 274832 Recycler (WU) Bobbin SH 3104 144773 BOBBIN CAP...
  • Page 172: Recycler Exploded View 7

    Section 7 UBA Pro RT/RQ™ Series Banknote Recycler Exploded Views & Parts Lists Recycler Exploded View 7 Figure 7-33 Recycler Exploded View 7 Figure 7-33 Recycler Exploded View 7 P/N 960-000213R_Rev.A © 2020, JAPAN CASH MACHINE CO., LTD. 7 - 5 0...
  • Page 173: Table 7-33 Recycler Parts List7

    Exploded Views & Parts Lists UBA Pro RT/RQ™ Series Banknote Recycler Section 7 Recycler Parts List 7 Table 7-33 Recycler Parts List7 EDP No. Description Remark 3201 274827 Recycler (WU) MAIN DRUM 3202 274837 Recycler (WU) Drum Axis 3203 216075 DRUM COVER 3204 274804...
  • Page 174: Recycler Exploded View 8

    Section 7 UBA Pro RT/RQ™ Series Banknote Recycler Exploded Views & Parts Lists Recycler Exploded View 8 Figure 7-34 Recycler Exploded View 8 Drum 2 Side 3303 3318 3318 3302 3304 3301 3318 3320 3318 3306 3307 3305 3320 3319 3312 3312 3320...
  • Page 175: Table 7-34 Recycler Parts List8

    Exploded Views & Parts Lists UBA Pro RT/RQ™ Series Banknote Recycler Section 7 Recycler Parts List 8 Table 7-34 Recycler Parts List8 EDP No. Description Remark 3301 274814 Recycler (WU) Course Guide 3302 144758 CROWN PULLEY 3303 216164 SPONGE ROLLER 3304 274808 Recycler (WU) Bottom Course...
  • Page 176: Recycler Exploded View 9

    Section 7 UBA Pro RT/RQ™ Series Banknote Recycler Exploded Views & Parts Lists Recycler Exploded View 9 Figure 7-35 Recycler Exploded View 9 Drum 2 Side 3415 3401 3401 3416 3416 3406 3402 3406 3404 3404 3409 3405 3403 3403 3407 3403 3403...
  • Page 177: Table 7-35 Recycler Parts List9

    Exploded Views & Parts Lists UBA Pro RT/RQ™ Series Banknote Recycler Section 7 Recycler Parts List 9 Table 7-35 Recycler Parts List9 EDP No. Description Remark 3401 216063 FILM SET CLIP 3402 274833 WU Pay-Out SH 3403 144584 BEARING 3404 274789 Recycler (WU) Latch CS 3405...
  • Page 178: Figure 7-36 Recycler Exploded View 10

    Section 7 UBA Pro RT/RQ™ Series Banknote Recycler Exploded Views & Parts Lists Recycler Exploded View 10 Figure 7-36 Recycler Exploded View 10 Figure 7-36 Recycler Exploded View 10 P/N 960-000213R_Rev.A © 2020, JAPAN CASH MACHINE CO., LTD. 7 - 5 6...
  • Page 179: Table 7-36 Recycler Parts List10

    Exploded Views & Parts Lists UBA Pro RT/RQ™ Series Banknote Recycler Section 7 Recycler Parts List 10 Table 7-36 Recycler Parts List10 EDP No. Description Remark 3501 274838 Recycler (WU) Guide Roller Shaft 3502 216066 GUIDE ROLLER 3503 274832 Recycler (WU) Bobbin Shaft 3504 144773 BOBBIN CAP...
  • Page 180: Figure 7-37 Recycler Exploded View 11

    Section 7 UBA Pro RT/RQ™ Series Banknote Recycler Exploded Views & Parts Lists Recycler Exploded View 11 Figure 7-37 Recycler Exploded View 11 Figure 7-37 Recycler Exploded View 11 P/N 960-000213R_Rev.A © 2020, JAPAN CASH MACHINE CO., LTD. 7 - 5 8...
  • Page 181: Table 7-37 Recycler Parts List11

    Exploded Views & Parts Lists UBA Pro RT/RQ™ Series Banknote Recycler Section 7 Recycler Parts List 11 Table 7-37 Recycler Parts List11 EDP No. Description Remark 3601 274827 Recycler (WU) MAIN DRUM 3602 274837 Recycler (WU) Drum Axis 3603 216075 DRUM COVER 3604 274805...
  • Page 182: Figure 7-38 Box Connect Module Exploded View

    Section 7 UBA Pro RT/RQ™ Series Banknote Recycler Exploded Views & Parts Lists Box Connect Module Exploded View Figure 7-38 Box Connect Module Exploded 3706 3703 3702 3707 3704 3701 3701 3705 Figure 7-38 Box Connect Module Exploded View Box Connect Module Parts List Table 7-38 Box Connect Module Parts List EDP No.
  • Page 183: Figure 7-39 Sh2 Box (400 Notes) Frame Exploded View

    Exploded Views & Parts Lists UBA Pro RT/RQ™ Series Banknote Recycler Section 7 SH2 Box (400 Notes) Frame Exploded View Figure 7-39 SH2 Box (400 Notes) Frame 3805 3804 3802 3801 3808 3808 3803 3808 3804 3808 3806 3809 3807 3809 Figure 7-39 SH2 Box (400 Notes) Frame Exploded View SH2 Box (400 Notes) Frame Parts List...
  • Page 184: Figure 7-40 Large Box (800 Notes) Frame Exploded View

    Section 7 UBA Pro RT/RQ™ Series Banknote Recycler Exploded Views & Parts Lists Large Box (800 Notes) Frame Exploded View Figure 7-40 Large Box (800 Notes) Frame 3905 3904 3902 3911 3901 3911 3911 3903 3904 3906 3913 3913 3912 3907 3912 3912...
  • Page 185: Table 7-40 Large Box (800 Notes) Frame Parts List

    Exploded Views & Parts Lists UBA Pro RT/RQ™ Series Banknote Recycler Section 7 Large Box (800 Notes) Frame Parts List Table 7-40 Large Box (800 Notes) Frame Parts List EDP No. Description Remark 3901 274783 Box Rail A 3902 274784 Box Rail B 3903 102984...
  • Page 186 Section 7 UBA Pro RT/RQ™ Series Banknote Recycler Exploded Views & Parts Lists THIS PAGE INTENTIONALLY LEFT BLANK P/N 960-000213R_Rev.A © 2020, JAPAN CASH MACHINE CO., LTD. 7 - 6 4...
  • Page 187 UBA Pro RT/RQ™ Series Banknote Recycler S e c t i o n 8 8 INDEX Banknote Jam RT/RQ clearing a ...2-11 UBA Pro RT/RQ Series Banknote Recycler ...1-1, 2-1, 4-1, 5-1, 6-1, 7-1, A-1 acronym for a Cleaning Safety methods of, and equipment required for ...2-15 Communications pictographs indicating...
  • Page 188 Section 8 UBA Pro RT/RQ™ Series Banknote Recycler Index THIS PAGE INTENTIONALLY LEFT BLANK P/N 960-000213R_Rev.A © 2020, JAPAN CASH MACHINE CO., LTD. 8 - 2...
  • Page 189: Troubleshooting

    UBA Pro RT/RQ™ Series Banknote Recycler A p p e n d i x A A TROUBLESHOOTING Troubleshooting Overview This section provides Troubleshooting instructions for the UBA Pro RT/RQ™ Series Banknote Recy- This product allows the Operator to perform fault cler (RT/RQ).
  • Page 190: Table A-1 Led Error Codes

    Appendix A UBA Pro RT/RQ™ Series Banknote Recycler Troubleshooting Table A-1 LED Error Codes (Continued) Error occurred when... OFF: Error in the UBA Pro Unit Blue: After dispensed (After PAY VALID) Green: In Stand-by Yellow: Accepting (Before VEND VALID) Downloading Software Red: After accepted (After VEND VALID) Magenta: Collecting White: Powering up...
  • Page 191 Troubleshooting UBA Pro RT/RQ™ Series Banknote Recycler Appendix A Table A-1 LED Error Codes (Continued) Error occurred when... OFF: Error in the UBA Pro Unit Blue: After dispensed (After PAY VALID) Green: In Stand-by Yellow: Accepting (Before VEND VALID) Downloading Software Red: After accepted (After VEND VALID) Magenta: Collecting White: Powering up...
  • Page 192: Figure A-1 Maintenance Equipment Requirements

    Appendix A UBA Pro RT/RQ™ Series Banknote Recycler Troubleshooting Maintenance Equipment This portion provides product information for the RT/RQ Unit. Maintenance Equipment Figure A-1 Maintenance Equipment Require- ments Figure A-1 Maintenance Equipment Requirements Table A-2 Additional Maintenance Equipment Parts List Ltr.
  • Page 193: Glossary

    UBA Pro RT/RQ™ Series Banknote Recycler A p p e n d i x B B GLOSSARY Acceptor a device used to validate and accept Banknotes, then communicate the acceptance re- sults to Host Machine... 1-1 Anti-Pullback Mechanism a mechanism (optical, mechanical, or a combination of both designed) to prevent the unauthorized retrieving of Banknotes from a Cash Box...
  • Page 194 Appendix B UBA Pro RT/RQ™ Series Banknote Recycler Glossary Photo-Coupler Isolation a method of increasing safety to both the equipment and personnel by isolating and routing transmitted data signals via Light Emitting Diode (LED) and Photosensitive Transistor combination circuit in various electronic equipment devices... 1-8 Pictograph small internationally recognized safety and attention symbols placed to the left of Notes, Cautions and Warnings throughout a JCM Maintenance Manual...
  • Page 195 UBA Pro RT/RQ™ Series Banknote Recycler P/N 960-000213R_Rev.A © 2020, JAPAN CASH MACHINE CO., LTD.
  • Page 196 UBA Pro RT/RQ™ Series Banknote Recycler Issue #4115-SME-01-00 P/N 960-000213R_Rev.A © 2020, JAPAN CASH MACHINE CO., LTD.

This manual is also suitable for:

Uba pro rq series

Table of Contents