Recycler Solenoid Test (Rq Transport); Drum 1 Motor Test (Rq Transport) - JCM GLOBAL UBA Pro RT Series Operation And Maintenance Manual

Banknote recycler
Table of Contents

Advertisement

Calibration and Testing
7. Remove the Recycler from the RQ Transport to
block the Note Position Sensor D through F.
Figure 6-156 Note Position
Figure 6-156 Note Position Sensor D - F Test
(RQ Transport) 5
8. The RQ Unit's Status LED will be lit at Magenta
when the Sensors function properly.
9. Set the UBA Pro DIP Switch #8 to
test.

Recycler Solenoid Test (RQ Transport)

To run the Recycler Solenoid on the RQ Transport
side, proceed as follows:
1. Remove electrical power.
2. Set the DIP Switches of the UBA Pro Unit as
below (Figure 6-157).
Figure 6-157 Recycle
DIP Switches #1, #2, #6, #8 ON
ON
1
2
3
Figure 6-157 Recycle Solenoid Test
3. Set the DIP Switches of the RQ Unit as below
(Figure 6-158).
Figure 6-158 Recycle
DIP Switches #5, #8 ON
ON
1
2
3
Figure 6-158 Recycle Solenoid Test
4. Apply electrical power.
5. Confirm that the Status LED/Collect Button is lit
at
Green
Color and then turns off.
NOTE: Wait for the Status LED to turn off
in order to run the test properly.
P/N 960-000213R_Rev.A
UBA Pro RT/RQ™ Series Banknote Recycler
to end the
ON
4
5
6
7
(RQ Transport) 1
4
5
6
7
(RQ Transport) 2
Figure 6-159 Recycle Sole-
Figure 6-159 Recycle Solenoid Test
6. To start the Test, set the UBA Pro DIP Switch #8
to
(Figure 6-160).
OFF
Figure 6-160 Recycle
DIP Switch #8 OFF
ON
1
Figure 6-160 Recycle Solenoid Test
7. The Solenoid will start operating when it func-
tions properly.
NOTE: Confirm the functionality aurally by
the sound that the Solenoid is making
while in the operation.
8. Set the UBA Pro DIP Switch #8 to
test.

Drum 1 Motor Test (RQ Transport)

To run the Recycler Solenoid on the RQ Transport
side, proceed as follows:
1. Remove electrical power.
2. Set the DIP Switches of the UBA Pro Unit as
below (Figure 6-161).
Figure 6-161 Drum 1
DIP Switches #1, #2, #6, #8 ON
8
ON
1
Figure 6-161 Drum 1 Motor Test (RQ Transport) 1
3. Set the DIP Switches of the RQ Unit as below
(Figure 6-162).
Figure 6-162 Drum 1
DIP Switches #6, #8 ON
8
ON
1
Figure 6-162 Drum 1 Motor Test (RQ Transport) 2
6 - 2 9
Green
ON
(RQ Transport) 3
2
3
4
5
6
(RQ Transport) 4
ON
2
3
4
5
6
2
3
4
5
6
© 2020, JAPAN CASH MACHINE CO., LTD.
Section 6
OFF
7
8
to end the
7
8
7
8

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Uba pro rq series

Table of Contents