Rt/Rq Transporting To Recycler Flow Process - JCM GLOBAL UBA Pro RT Series Operation And Maintenance Manual

Banknote recycler
Table of Contents

Advertisement

Installation

RT/RQ Transporting to Recycler Flow Process

Figure 2-36 RT/RQ Transporting to Recycler
Flow Process
C1
a
NO
b
YES
d
e
YES
NO
g
h
i
YES
NO
A
*1). When an abnormal signal is received, remove and re-supply Power to the RT/RQ Unit after resolving the problem, or send a
RESET Command from the Host Machine.
*2). When a Recycler(s) is full, the recyclable Banknotes are collected into the Cash Box until the "Full" detection is cleared. The
RT/RQ responds via Status Request from the Host Machine while it is performing when a Recycler(s) is full.
P/N 960-000213R_Rev.A
UBA Pro RT/RQ™ Series Banknote Recycler
NO
c
YES
f
j
Figure 2-36 RT/RQ Transporting to Recycler Flow Process
C1) From "Accepting Banknotes" flowchart 
(Figure 2-35)
a) Transporting the Banknote to the Recycler
b) Was the Banknote transported to the Recycler?
c) Retried the transportation operation three (3) times?
d) Rotate the Anti-Pullback (PB) Unit
e) Was an Abnormal Error detected by the PB Unit?
f) Stop operation (Abnormal Signal Output (*1)
g) Sending an Acceptance VEND Signal
h) Collecting the Banknote
i) Is the Recycler full?
j) Stop operation. Sending FULL Signal (*2)
A) Return to "A" Main flowchart (Figure 2-34)
© 2020, JAPAN CASH MACHINE CO., LTD.
2 - 2 3
Section 2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Uba pro rq series

Table of Contents