12.6

Recommissioning

12.6 Recommissioning
Execute commissioning as with a new device, see 
ZMounting–
.
292
Instruction handbook b maXX 5000
Document No.: 5.09021.16
of 328
as from page 107,
NOTICE!
Recommissioning without forming of the capacitors.
From six months storage period on, the capacitors are destroyed during commission-
ing, if they are not formed beforehand
m Reform the DC link capacitors:
n by supplying the device ready-to-operate for at least one hour with 
supply voltage
n but do not transmit a pulse enable during this time.
m Consider, that it is imperative, to connect the accordingly prescribed line commu-
tating choke for this forming procedure. Devices, where no line commutating choke
is necessary can directly be supplied with mains voltage.
ZInstallation–
as from page 123.
Baumüller Nürnberg GmbH

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bm5100 seriesBm5300 seriesBm5000 seriesB maxx 5000B maxx 5100B maxx 5300

Table of Contents