Requirements to the executing personnel

12.2 Requirements to the executing personnel
The personnel, who is appointed to setting out of operation, must have the required
knowledge and instructions, which is necessary for an execution according to the rules.
Select the personnel in such a way, that the safety instructions, which are mounted to the
device and its parts as well as to the connections, are understood and applied to.

12.3 Shutdown

Execute the setting out of operation as follows:
1 Put the device off-circuit and assure the device against unintentional restart.
2 Check the isolation from supply of all connections (earliest 10 minutes after switching
3 Demount the connections and protect the connections according to the 
4 Document the shut down setting.

12.4 Demounting

The demounting assumes a completed, documented setting out of operation.
290
Instruction handbook b maXX 5000
Document No.: 5.09021.16
of 328
off).
safety instructions.
NOTICE!
Note sharp edges.
In case, while installing, you lift a device with unprotected hands, fingers/palm can be
cut. If the device falls off, your feet can be cut up.
Therefore:
m Ensure that only qualified personnel, who are familiar with the safety notes and as-
sembly instructions, demount this device.
Wear safety gloves.
mWear safety shoes.
Baumüller Nürnberg GmbH

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bm5100 seriesBm5300 seriesBm5000 seriesB maxx 5000B maxx 5100B maxx 5300

Table of Contents