8.4.4

POWERLINK

.
Type code b maXX 5000 with POWERLINK
BM5XXX-XXXX-XXXX-04XX-
b maXX 5000 devices can communicate with a POWERLINK
fieldbus connection POWERLINK
X3 and X4 on the front side of the device are the RJ45 connections for POWERLINK
(also see
axis units BM53XX–
Mounting and in-
The mounting/installation consists of the following steps:
stallation.
1 De-energize the b maXX 5000 device
2 Set the b maXX 5000 IP-address,
3 Connect b maXX 5000 with Ethernet-connection cables.
Commissioning.
The following preconditions must be fulfilled before commissioning:
1 b maXX 5000 with POWERLINK
2 The control cabinet is properly locked and all safety devices are operating.
3 The b maXX 5000 device is ready-to-use.
By means of the address switches S3 and S4 the last byte of the IP-address is set 
Address switch
(Refer to settings
IP address 192.168.100.0 is not allowed.
Further information about the setting possibilities of the POWERLINK
see „Application Manual".
Parameters
The parameter settings determine the behavior of the POWERLINK
operation. Parameters are set via the software ProDrive.
1 Start ProDrive
2 Click on „Project Tree".
3 Communication settings using ProDrive
ZFront side of active mains rectifier BM51XX–
on page 175).
see
ZSetting the IP address with address switches–
n Please, observe an EMC-compatible laying of the Ethernet connection cables!
n The following cables were released for use by Baumüller:
Ethernet-connection cable; 
Further information see
n Ethernet-connection cables are wired correctly.
ZSetting the IP address with address switches–
n Project Tree: Configuration/Fieldbus Slave 
(refer also Parameter manual b maXX 5000)
m set Synchronization to „On"
m SYNC time = Fieldbus cycle time = POWERLINK
This setting is not necessary if using the POWERLINK
®
LINK
Managing Node sets a valid value in object 0x1006 „Communication cycle
period".
®
:
®
.
®
ZEtherCAT
, VARAN, POWERLINK
®
is installed correctly.
Instruction handbook b maXX 5000
Document No.: 5.09021.16
Operation
®
Managing Node via the
on page 173 and
ZFront side
as from page 100
®
cable–
on page 249.
as from page 100). 
®
Controlled Node
®
Controlled Node in
®
cycle time = 500 µs to 8 ms
®
profile and the POWER-
8
®
219
of 328

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bm5100 seriesBm5300 seriesBm5000 seriesB maxx 5000B maxx 5100B maxx 5300

Table of Contents