7.12 Installation procedure
DANGER!
Risk of fatal injury from electrical current!
Electrically live parts are life-threatening.
Therefore:
m Make certain that the parts to be mounted (e.g. mains cables) and the mounting
h Route all cables in an EMC-compatible manner.
h Connect cables (see
h For all connections, attentions is to be paid to strain relief
The installation comprises the following steps:
1 Connect the motor through terminals 1U2, 1V2, 1W2 and PE.
NOTICE!
Internal overload protection operates exceeding 200 % of the motor rated current (full
load current).
2 Connect the DC link - only for BM53XX, refer to
3 Connect fuses (F1) - not for BM53XX
4 Connect the main contactor - not for BM53XX
5 Connect the line filters (Z1) - not for BM53XX.
6 Connect the choke (L1) to the mains filter output (not necessary for BM53XX).
7 Connect devices to the mains choke output via the mains input terminals 1U1, 1V1
8 Connect the protective ground conductor to the PE terminal (a fixed ground conductor
9 Connect 24 V power supply:
10 Connect the signal bus cable (see
areas are de-energized for the entire duration of mounting the device.
ZConnection diagrams–
(Observe the permissible torques!)
Ensure the proper phases when connecting (rotational direction).
Observe the permissible torques!
page 116
(if UL 508C is being considered, the UL-listed semiconductor or entire area fuses stat-
ed in Chapter
ZFuses–
and 1W1 - not with BM53XX.
The mains cable has to be laid through the toroidal cores to ensure an operation within
a C2 environment (see also
connection is absolutely mandatory).
BM50XX, BM51XX, BM53XX via terminals X200 -1, X200 -2
(if UL 508C is being considered, then the current is limited to 4 A).
as from page 143).
as from page 261 are to be used).
ZMounting of toroidal cores–
ZX300 (SELV/PELV)–
Instruction handbook b maXX 5000
Document No.: 5.09021.16
Installation
ZMounting of the DC link bar–
as from page 119)
as from page 170).
7
on
141