5
PRE-OPERATION PROCEDURES
(From the previous page)
Check box
Connect the EtherNet/IP module to the EtherNet/IP
network.
Turn on Tag communication start request (Y00), and
start Tag communication.
Check if Tag communications are normal in the
"Main" tab window of the utility package.
Is Tag communication normal?
Programming or debugging
Reset the QCPU, and then set it to RUN.
Normal
Completed
Figure 5.6 Pre-operation procedures (continued)
Section 5.7 Wiring
Section 3.2.2 Tag communication start request (Y00),
Tag communication start process completion (X00)
Section 7.6 "Main" Tab (Module Status Display)
Error
Section 9.3 When Tag Communication is Disabled
CHAPTER 8 PROGRAMMING
5.2 Pre-Operation Procedures
5.2.2 Pre-operation procedures
1
2
3
4
5
6
7
8
5
- 8