Inspection Items And Schedule; Wide Radial Cylinder; Grease Supply Timing - IAI ROBO Cylinder RCS4-WRA12C Instruction Manual

Wide radial cylinder
Table of Contents

Advertisement

4.2 Inspection Items and Schedule

4.2 Inspection Items and Schedule

Follow the maintenance inspection schedule below.
It is assumed that the equipment is operating 8 hours per day.
If the equipment is running continuously night and day or otherwise running at a high operating
rate, inspect more often as needed.

Wide Radial Cylinder

Inspection Period
Start of work inspection
1 month inspection
3 month inspection
Every 3 months thereafter
3 months after starting
operation
6 month inspection
Every 6 months thereafter
Grease Supply Timing (Reference)
Maximum Speed of Use [mm/s]
0 to 750 or less
750 to 1300 or less
4-3
External
Internal
Inspection
Inspection
Grease Supply Timing (Reference)
Operated distance
1,250 km
2,500 km
Greasing
Rod sliding
Ball screw and guide
surface

Grease supply timing

(Reference)
dependent
Months
12 month