4.2 Inspection Items and Schedule
4.2 Inspection Items and Schedule
Follow the maintenance inspection schedule below.
It is assumed that the equipment is operating 8 hours per day.
If the equipment is running continuously night and day or otherwise running at a high operating
rate, inspect more often as needed.
Wide Radial Cylinder
Inspection Period
Start of work inspection
1 month inspection
3 month inspection
Every 3 months thereafter
3 months after starting
operation
6 month inspection
Every 6 months thereafter
Grease Supply Timing (Reference)
Maximum Speed of Use [mm/s]
0 to 750 or less
750 to 1300 or less
4-3
External
Internal
Inspection
Inspection
–
–
–
–
–
–
–
Grease Supply Timing (Reference)
Operated distance
1,250 km
2,500 km
Greasing
Rod sliding
Ball screw and guide
surface
–
–
–
–
–
Grease supply timing
–
(Reference)
dependent
Months
12 month
Need help?
Do you have a question about the ROBO Cylinder RCS4-WRA12C and is the answer not in the manual?