Supplementary Functions
13.1 Dwell Time
The time taken until the next operation after the completion of an executed positioning table in
the automatic operation is called dwell time.
For E-point control
The dwell time is the time taken from the completion of the position reference until the
operation done flag turns ON.
For P-point control
While the positioning unit is in P-point control, the positioning table will operate consecutively,
and the dwell time will be ignored. For the last table (E point), like E-point control, dwell time is
a period required from the completion of the position reference until the operation done flag
turns ON.
For C-point control
The dwell time is the waiting time for executing the next table from the completion of the
positioning table (deceleration stop). For the last table (E point), like E-point control, dwell time
is a period required from the completion of the position reference until the operation done flag
turns ON.
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www.clrwtr.com - Email: info@clrwtr.com
13-2