Dell PowerConnect J-EX4200-24T Software Manual page 817

J series; j-ex series
Table of Contents

Advertisement

Verification
Purpose
Action
}
}
}
ae1 {
aggregated-ether-options {
link-speed 10g;
minimum-links 2;
}
unit 0 {
family inet {
address 192.0.2.128/25;
}
}
ge–0/1/0 {
ether-options {
802.ad ae0;
}
}
ge–1/1/0 {
ether-options {
802.ad ae0;
}
}
ge–0/1/1 {
ether-options {
802.ad ae1;
}
}
gxe–1/1/1 {
ether-options {
802.ad ae1;
}
}
}
To verify that switching is operational and two LAGs have been created, perform these
tasks:
Verifying That LAG ae0 Has Been Created on page 745
Verifying That LAG ae1 Has Been Created on page 746
Verifying That LAG ae0 Has Been Created
Verify that LAG
ae0
has been created on the switch.
show interfaces ae0 terse
Interface
Admin
ae0
up
ae0.0
up
Chapter 44: Virtual Chassis—Configuration Examples
Link Proto
Local
up
up
inet
10.10.10.2/24
Remote
745

Advertisement

Table of Contents
loading

Table of Contents