Dell PowerConnect J-EX4200-24T Software Manual page 958

J series; j-ex series
Table of Contents

Advertisement

Dell PowerConnect J-Series Ethernet Switch Complete Software Guide for Junos OS
Verification
Purpose
Action
Meaning
Purpose
Action
886
address 192.0.2.128/25;
}
}
xe–0/1/0 {
ether-options {
802.ad ae0;
}
}
xe–2/1/0 {
ether-options {
802.ad ae0;
}
}
xe–0/1/1 {
ether-options {
802.ad ae1;
}
}
xe–12/1/1 {
ether-options {
802.ad ae1;
}
}
}
To verify that switching is operational and two LAGs have been created, perform these
tasks:
Verifying That LAG ae0 Has Been Created on page 886
Verifying That LAG ae1 Has Been Created on page 886
Verifying That LAG ae0 Has Been Created
Verify that LAG
has been created on the switch.
ae0
show interfaces ae0 terse
Interface
Admin
ae0
up
ae0.0
up
The output confirms that the
to this link.
Verifying That LAG ae1 Has Been Created
Verify that LAG
ae1
has been created on the switch
show interfaces ae1 terse
Link Proto
Local
up
up
inet
10.10.10.2/24
link is up and shows the
ae0
Remote
and IP address assigned
family

Advertisement

Table of Contents
loading

Table of Contents