Mounting Procedure For Side-By-Side Flush Mounting - ABB REL650 Technical Manual

Hide thumbs Also See for REL650:
Table of Contents

Advertisement

1MRK 506 382-UEN A
20.4.5.2
20.5
20.5.1
Line distance protection REL650 2.2 IEC
Technical manual

Mounting procedure for side-by-side flush mounting

2
1
IEC06000181-2-en.vsd
IEC06000181 V2 EN-US
Figure 425:
Side-by-side flush mounting details (RHGS6 side-by-side with 1/2 x
19" IED).
The required torque for the screws is 3.5 Nm.
PosNo
Description
1
Mounting plate
2, 3
Screw, washer
4
Mounting angle
Technical data
Enclosure
Table 659:
Case
Material
Front plate
Surface treatment
Finish
3
4
Quantity
2
16
2
Steel sheet
Stainless steel with cut-out for HMI
Aluzink preplated steel
Light grey (RAL 7035)
Section 20
IED hardware
M12730-6 v4
Type
-
M4x6
-
IP16276-1 v1
IP16278-1 v1
M11778-1 v6
879

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion 650 series

Table of Contents